FIELD: mining, particularly, methods of making holes and working. SUBSTANCE: method includes location of self-contained unit at point of hole making. Unit is used for rock breaking beginning from hole mouth with hole bottom disintegration by jets of working agent flowing from working member of drilling unit under pressure and carrying of broken rock parts out of hollow of formed hole by ascending flow at velocity exceeding velocity of free fall of rock particles. Upon completion of process, hole hollow is freed form drilling unit. In case of instantaneous collapse of hole wall and its fall into hole hollow, further cutting of bottom is discontinued, and excessive pressure is built up in hole hollow owing to supply into hollow of excessive working agent. EFFECT: higher efficiency and productivity in making holes and workings. 9 dwg
Title | Year | Author | Number |
---|---|---|---|
TECHNOLOGY FOR DEVELOPMENT OF WELLS AND BORES | 2008 |
|
RU2373366C1 |
TECHNOLOGY OF WELL CONSTRUCTION IN GEOLOGICAL STRUCTURES | 1999 |
|
RU2161245C1 |
METHOD OF MAKING HOLES AND WORKINGS IN GEOLOGICAL STRUCTURES | 1999 |
|
RU2168598C1 |
TECHNICAL COMPLEX FOR FORMING WELLS AND MINES IN SEDIMENTARY MOUNTAIN ROCKS | 2002 |
|
RU2240420C2 |
METHOD FOR FORMING WELLS AND EXCAVATIONS IN SEDIMENTARY ROCK LAYERS AND FROZEN SOIL | 2002 |
|
RU2225931C1 |
METHOD FOR DEVELOPMENT OF WELLS AND WORKINGS IN ROCKS | 2011 |
|
RU2457311C1 |
METHOD OF HOLE MAKING IN GEOLOGICAL STRUCTURES | 2001 |
|
RU2178506C1 |
SELF-CONTAINED APPARATUS FOR MAKING HOLES AND WORKINGS | 2000 |
|
RU2178504C1 |
GEAR TO DRIVE WORKINGS IN GEOLOGICAL STRUCTURES | 2002 |
|
RU2222681C1 |
WELL BUILDING PLANT | 2011 |
|
RU2475617C1 |
Authors
Dates
2001-06-20—Published
1999-04-21—Filed