FIELD: current distribution in electrolyzers. SUBSTANCE: bus arrangement is provided with self-fired anode and upper two-sided current lead at two-row longitudinal arrangement of electrolyzers in housing; it is also provided with cathode bus arrangement and pins, buses and risers of anode bus arrangement. Bus arrangement is provided with jumpers connecting the anode buses at electrolyzer input and output; they are mounted between connector of anode buses with anode risers and area of mounting of end anode pins. Each jumper is made in form of two L-shaped aluminum buses connected by means of electric arc welding. EFFECT: improved current distribution among electrolyzers; avoidance of effect of damage of previous electrolyzers on next electrolyzers arranged in one row. 2 cl, 1 dwg
| Title | Year | Author | Number | 
|---|---|---|---|
| EQUIPPING OF AN ALUMINUM ELECTROLYZING BATH WITH THE BUS-BARS | 2003 | 
 | RU2259427C2 | 
| EQUIPPING OF POWERFUL ALUMINUM ELECTROLYZERS WITH THE BUS-BARS | 2003 | 
 | RU2259428C2 | 
| ALUMINUM ELECTROLYZER BUS ARRANGEMENT | 2003 | 
 | RU2281989C2 | 
| BUS ARRANGEMENT OF ELECTROLYZER PRODUCING ALUMINUM | 1998 | 
 | RU2162901C2 | 
| BUSBARS OF HIGH-POWER ALUMINUM CELLS | 2004 | 
 | RU2255148C1 | 
| EQUIPPING THE ALUMINUM ELECTROLYZERS WITH THE BUSBARS | 2005 | 
 | RU2295589C1 | 
| BUS ARRANGEMENT OF ELECTROLYSIS CELL FOR PRODUCING ALUMINIUM | 2012 | 
 | RU2505626C1 | 
| BUSBARS OF ALUMINUM CELL | 2003 | 
 | RU2255147C2 | 
| BUS ARRANGEMENT OF POWERFUL ALUMINIUM ELECTROLYZERS AT THEIR LONGITUDINAL LOCATION IN HOUSING | 1989 | 
 | RU2007504C1 | 
| METHOD FOR REPLACEMENT OF FOUR-RISER BUSBAR BY THREE-RISER BUSBAR IN SODERBERG ALUMINIUM ELECTROLYSER | 2012 | 
 | RU2516415C1 | 