FIELD: current distribution in electrolyzers. SUBSTANCE: bus arrangement is provided with self-fired anode and upper two-sided current lead at two-row longitudinal arrangement of electrolyzers in housing; it is also provided with cathode bus arrangement and pins, buses and risers of anode bus arrangement. Bus arrangement is provided with jumpers connecting the anode buses at electrolyzer input and output; they are mounted between connector of anode buses with anode risers and area of mounting of end anode pins. Each jumper is made in form of two L-shaped aluminum buses connected by means of electric arc welding. EFFECT: improved current distribution among electrolyzers; avoidance of effect of damage of previous electrolyzers on next electrolyzers arranged in one row. 2 cl, 1 dwg
Title | Year | Author | Number |
---|---|---|---|
EQUIPPING OF AN ALUMINUM ELECTROLYZING BATH WITH THE BUS-BARS | 2003 |
|
RU2259427C2 |
EQUIPPING OF POWERFUL ALUMINUM ELECTROLYZERS WITH THE BUS-BARS | 2003 |
|
RU2259428C2 |
ALUMINUM ELECTROLYZER BUS ARRANGEMENT | 2003 |
|
RU2281989C2 |
BUS ARRANGEMENT OF ELECTROLYZER PRODUCING ALUMINUM | 1998 |
|
RU2162901C2 |
BUSBARS OF HIGH-POWER ALUMINUM CELLS | 2004 |
|
RU2255148C1 |
EQUIPPING THE ALUMINUM ELECTROLYZERS WITH THE BUSBARS | 2005 |
|
RU2295589C1 |
BUS ARRANGEMENT OF ELECTROLYSIS CELL FOR PRODUCING ALUMINIUM | 2012 |
|
RU2505626C1 |
BUSBARS OF ALUMINUM CELL | 2003 |
|
RU2255147C2 |
BUS ARRANGEMENT OF POWERFUL ALUMINIUM ELECTROLYZERS AT THEIR LONGITUDINAL LOCATION IN HOUSING | 1989 |
|
RU2007504C1 |
METHOD FOR REPLACEMENT OF FOUR-RISER BUSBAR BY THREE-RISER BUSBAR IN SODERBERG ALUMINIUM ELECTROLYSER | 2012 |
|
RU2516415C1 |
Authors
Dates
2001-06-27—Published
2000-02-01—Filed