FIELD: gas mains. SUBSTANCE: proposed method comes to replacement of gas generator and power turbine by gas turbine engine with clockwise direction of rotation of power turbine rotor, finishing of bed frame, seal unit, centrifugal blower, air intake chamber, gas transfer set covering, fuel device unit, systems of lubrication, power supply, automatic control and instruments. Gas turbine engine and modified blower in combination with above-indicated modified processing systems form gas pumping set, i.e. device designed for implementing proposed method of reconstruction of compressor station. EFFECT: increased capacity of compressor station after reconstruction at maximum usage of compressor station processing equipment, simplified process of reconstruction and out down time taken for work. 3 cl, 2 dwg
Title | Year | Author | Number |
---|---|---|---|
COMPRESSOR STATION OF MAIN GAS PIPE LINE | 2002 |
|
RU2198342C1 |
GAS PUMPING SET OF GAS MAIN COMPRESSOR STATION | 2002 |
|
RU2200255C1 |
GAS TRANSFER STATION | 2001 |
|
RU2208184C1 |
GAS-COMPRESSOR PLANT | 2009 |
|
RU2403416C1 |
ANTIICING SYSTEM OF GAS TRANSFER UNIT WITH GAS TURBINE DRIVE | 2014 |
|
RU2573437C1 |
LUBRICATING SYSTEM OF GAS COMPRESSOR UNIT WITH STATIONARY GAS TURBINE ENGINE | 2019 |
|
RU2742591C1 |
GAS COMPRESSOR UNIT | 2018 |
|
RU2691230C1 |
METHOD FOR ASSEMBLING GAS PUMPING AGGREGATE | 1999 |
|
RU2159871C1 |
COMPLEX AIR-CLEANING DEVICE AS PART OF A GAS-PUMPING UNIT | 2021 |
|
RU2758874C1 |
GAS PUMPING UNIT AND METHOD OF ITS START-UP | 2014 |
|
RU2607113C2 |
Authors
Dates
2001-07-10—Published
2000-01-10—Filed