FIELD: shipbuilding; equipment for elimination of after-effects of accidents. SUBSTANCE: proposed complex includes watercraft and transport facility. Watercraft is provided with respective equipment for performing cleaning, as well as lowering and hoisting jobs. Watercraft is adaptable for running through shallow waters. Transport facility is provided with cargo space for receiving the watercraft by docking it. Both watercraft and transport facility may be used for operation in deep water. To this end, watercraft is placed on transport facility. Complex is propelled by engine and propulsion plant of watercraft. EFFECT: extended range of jobs conducted in shallow waters and at sea where high seaworthiness is required; avoidance of long-term work for adaptation of equipment to type of water area. 2 cl, 3 dwg
Title | Year | Author | Number |
---|---|---|---|
COMPLEX FOR OPERATION IN WATER AREA | 2009 |
|
RU2406642C1 |
METHOD OF PERFORMING UNDERWATER HOIST AND TRANSPORTATION OPERATIONS AND DEVICE FOR REALIZATION OF THIS METHOD | 2001 |
|
RU2238876C2 |
SHIP BOARD DEVICE FOR UNDERWATER LOWERING/HOISTING OPERATIONS | 1993 |
|
RU2093410C1 |
FLOATING PLATFORM FOR MARINE STRUCTURES AND RAISING OF SUNKEN VESSELS | 2003 |
|
RU2261818C2 |
DEVICE FOR LOCALIZATION OF POLLUTION SPOT FLOATING ON WATER SURFACE | 1997 |
|
RU2127787C1 |
VESSEL-DOCK | 2006 |
|
RU2326786C1 |
DIVER TUGBOAT (VERSIONS) | 1999 |
|
RU2154591C1 |
INSTALLATION AND REMOVAL METHOD OF BOTTOM COMPLEX FOR PERFORMING WORKS ON SHELF, AND COMPLEX OF EQUIPMENT FOR IMPLEMENTING THEREOF | 2008 |
|
RU2381135C1 |
SHIPBOARD DEVICE FOR RAISING SUNKEN OBJECT | 1991 |
|
RU2013301C1 |
MULTIPURPOSE TRANSPORT SHIP | 2015 |
|
RU2603709C1 |
Authors
Dates
2001-07-20—Published
2000-05-25—Filed