FIELD: oil and gas producing industry; applicable in reduction of water cutting of well production and increase of oil recovery from formation. SUBSTANCE: method includes installation in well of unit of directed wave stimulation and provision of hydrodynamic impacts onto said unit. Device for method embodiment includes weight for delivering of hydrodynamic impacts, hoisting mechanism connected with weight and unit of directed wave stimulation. Unit is formed by, at least, two cylindrical members with axial and radial channels. One cylindrical member is built in cement plug. The other cylindrical members are located above cement plug for possible alignment of axial channels. Lower end of member built in cement blind from below. EFFECT: reduced water cutting of well products, higher oil recovery from formation. 5 cl, 1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD AND DEVICE FOR TREATING DEPOSIT BY ELASTIC VIBRATIONS | 1995 |
|
RU2105143C1 |
DEVICE FOR TREATING DEPOSIT BY WAVES | 1997 |
|
RU2139405C1 |
PLANT FOR PULSE STIMULATION OF POOL | 1997 |
|
RU2140533C1 |
METHOD OF DEVELOPING OIL DEPOSITS | 1997 |
|
RU2135752C1 |
METHOD OF LOST CIRCULATION CONTROL IN WELL REPAIR AND ISOLATION OPERATIONS (VERSIONS) | 1999 |
|
RU2155858C1 |
EMITTER FOR CREATING A WAVE AGITATION ON HIGHLY HEAVILY OIL FIELDS | 2022 |
|
RU2792459C1 |
METHOD OF INCREASING OIL WELL PRODUCTIVITY | 1999 |
|
RU2177535C2 |
HYDRODYNAMIC PULSED-PRESSURE GENERATOR | 2002 |
|
RU2212513C1 |
METHOD FOR DEVELOPMENT OF OIL DEPOSIT | 1996 |
|
RU2114286C1 |
CALIBRATOR | 1999 |
|
RU2164285C1 |
Authors
Dates
2001-07-27—Published
2000-08-14—Filed