FIELD: rail track running repair. SUBSTANCE: noncontact pickups are mounted on vehicle to detect marks on rail length and noncontact pickup is installed to defect datum marks. Noncontact pickups for detecting marks on rail length are spaced along vehicle and connected with recorder through corresponding pulse counters and computer. Datum mark noncontact pickup is connected with recorder through pulse counter and computer. Pulse generator is connected to corresponding inputs of pulse counters. EFFECT: improved accuracy of measurement. 2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF DETERMINING LONGITUDINAL STRESSED STATE OF RAIL LENGTHS OF CONTINUOUS RAIL TRACK | 2003 |
|
RU2239574C1 |
CONTROL METHOD OF RAIL STRINGS OF CONTINUOUS WELDED RAILROAD TRACK | 2012 |
|
RU2521114C1 |
METHOD OF CONTROLLING CONTINUOUS WELDED RAIL TRACK RAIL LENGTHS | 2011 |
|
RU2454344C1 |
CONTROL METHOD OF THE JOINTLESS RAILWAY TRACK | 2017 |
|
RU2656777C2 |
RAIL FASTENING | 2001 |
|
RU2216619C2 |
METHOD TO MONITOR TEMPERATURE MODE OF OPERATION OF CONTINUOUS WELDED RAILROAD TRACK | 2016 |
|
RU2617319C1 |
METHOD FOR DETERMINATION OF ACTUAL TEMPERATURE OF ANCHORING OF RAIL BED | 2020 |
|
RU2743650C1 |
METHOD FOR ASTIMATING STABILITY MARGIN OF CONTINUOUS WELDED RAILWAY TRACK | 2016 |
|
RU2617315C1 |
RAIL FASTENING | 2001 |
|
RU2216620C2 |
METHOD FOR ASSESSING THEFT OF RAIL SECTION | 2015 |
|
RU2578897C1 |
Authors
Dates
2001-09-27—Published
2000-11-08—Filed