FIELD: mining industry. SUBSTANCE: high-power cartridge-free granulated explosives of class 1 are used in the capacity of explosives for charging downward blast-holes. In this case blast-holes are filled with highly concentrated solution of ammonium nitrate If dry blast-holes are charged first explosives are placed into blast- holes and then solution of highly concentrated ammonium nitrate is poured. If heavily flooded blast-holes are drilled first water is driven out of blast-holes by solution of ammonium nitrate which is fed by hose to bottom of blast-holes and then explosives are fed. EFFECT: enhanced efficiency of blasting operations while driving vertical and inclined mine shafts. 4 cl
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR PREPARATION OF EXPLOSIVE CHARGES FOR CHARGING DRY AND FLOODED HOLES | 1997 |
|
RU2117912C1 |
PROCESS OF LOADING OF DOWNGOING HOLES WITH WATER-CARRYING EXPLOSIVES (VERSIONS) | 1999 |
|
RU2146037C1 |
METHOD FOR LOADING WATERED RISING WELLS | 2008 |
|
RU2362970C1 |
METHOD OF HOLE CHARGING | 1997 |
|
RU2133942C1 |
METHOD FOR PREPARATION OF EXPLOSIVE COMPOUNDS AT CHARGING OF BLAST-HOLES AND WELLS (MODIFICATIONS) | 1998 |
|
RU2138009C1 |
METHOD FOR CONTOUR BLASTING | 1999 |
|
RU2158413C1 |
PROCESS OF CHARGING OF DESCENDING HOLES WITH EXPLOSIVE | 1997 |
|
RU2131584C1 |
METHOD OF MANUFACTURING BOREHOLE CHARGE | 1995 |
|
RU2080315C1 |
METHOD FOR DETERMINING KNOCK ATTENUATION | 2020 |
|
RU2748830C1 |
METHOD OF RUNNING OF THE BLASTING OPERATIONS IN THE FLOODED WELL USING THE CHARGE OF THE EMULSION BLASTING EXPLOSIVE | 2006 |
|
RU2305673C1 |
Authors
Dates
2001-10-27—Published
2000-04-26—Filed