FIELD: mining and construction; may be used in carrying out mining and construction operations on the ground surface. SUBSTANCE: filling with solutions of explosive charges is carried out under conditions of mining enterprise - customer in the form of cartridges filled with solution of grammonites of 79/21 and 82/18, 50/50 types of flakes trotyl in polyethylene shells. Length of polyethylene shells exceed that of charge by at least 1.2 times. Filling of cartridges with saltpeter solution with concentration of at least 20% is performed by opening the shell upper part in cartridge vertical position at the site of performance of blasting operations. Solution occupies 10-12% of explosive weight. EFFECT: excluded dusting of explosives in hole charging; higher water stability of explosives with their economical use. 6 cl
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR CHARGING FLOODED HOLES WITH FLAKED OR GRANULATED TROTYL UNDER CONDITIONS OF SUBZERO TEMPERATURES | 1997 |
|
RU2117911C1 |
EXPLOSIVE COMPOSITION AND A METHOD OF PREPARING BOREHOLE CHARGE | 2001 |
|
RU2205168C1 |
PROCEDURE FOR CHARGING DOWNWARD BLAST-HOLES IN PROCESS OF DRILLING AND BLASTING OF VERTICAL AND INCLINED MINE SHAFTS | 2000 |
|
RU2175433C1 |
METHOD OF HOLE CHARGING | 1997 |
|
RU2133942C1 |
METHOD OF CHARGING OF DESCENDING BLAST HOLES WITH HOT-FLOWING WATER-CONTAINING EXPLOSIVES | 1994 |
|
RU2100773C1 |
METHOD FOR LOADING WATERED RISING WELLS | 2008 |
|
RU2362970C1 |
COMPOSITIONS OF EXPLOSIVE MIXTURES AND METHODS FOR PRODUCTION THEREOF | 2014 |
|
RU2595709C2 |
PROCESS OF LOADING OF DOWNGOING HOLES WITH WATER-CARRYING EXPLOSIVES (VERSIONS) | 1999 |
|
RU2146037C1 |
METHOD FOR CONDUCTING OF DRILLING AND BLASTING OPERATIONS (MODIFICATIONS) | 2005 |
|
RU2283473C1 |
CARTRIDGE FOR COMMERCIAL BLASTING | 2002 |
|
RU2231014C2 |
Authors
Dates
1998-08-20—Published
1997-11-12—Filed