FIELD: construction engineering; pipeline erection and repairing. SUBSTANCE: pipeline is laid in protective casing (cylindrical sheath). End seals are installed in-between pipes. Metal ledges are joined to cylindrical sheath; length of intermediate ledge is equal to width of roadway. EFFECT: enhanced reliability of crossing. 1 dwg _
Title | Year | Author | Number |
---|---|---|---|
PIPE LINE PASS UNDER AUTOMOBILE ROAD | 1998 |
|
RU2186281C2 |
PIPELINE LAID UNDER AUTOMOBILE ROAD | 1997 |
|
RU2162979C2 |
PIPE LINE PASS UNDER AUTOMOBILE ROAD | 2001 |
|
RU2186283C1 |
METHOD OF REPAIRING HIGH-PRESSURE MAIN GAS PIPELINE HAVING ISOLATION COATING DEFECTS (PIPE-CASING CONTACTS) LOCATED UNDER ROAD PAVEMENT AND CROSSING ROAD TRAFFIC WAY | 2002 |
|
RU2232332C2 |
METHOD FOR REPAIR OF PIPE-LINE ADAPTER | 1998 |
|
RU2142090C1 |
PIPELINE RESTORATION METHOD | 1999 |
|
RU2195599C2 |
PIPELINES TRANSITION THROUGH VEHICLE ROAD | 2014 |
|
RU2607577C2 |
SYSTEM OF ROAD CROSSING OF MAIN AND PROCEDURE FOR ITS FABRICATION | 2010 |
|
RU2426930C1 |
CONSTRUCTION OF UNDERGROUND SECTION OF PIPE LINE | 1996 |
|
RU2121099C1 |
DEVICE FOR PROTECTION AND FIXATION OF PIPELINE | 2021 |
|
RU2793804C1 |
Authors
Dates
2002-02-10—Published
1999-12-14—Filed