FIELD: machine building.
SUBSTANCE: inventions can be implemented at construction and reconstruction of crossing of mains (M) over rail and motor roads. The essence of the invention is like follows: tube space between M and protective jacket (PJ) is filled with a plastic mass on base of synthetic high molecular compounds. Further, the procedure for fabrication consists in filling tube space M-PJ either with heated plastic through collectors or under pressure through a vent stalk of the PJ.
EFFECT: increased reliability and service life of crossing due to increased rigidity and moisture resistance of system, raised processability of fabrication of new and reconstruction of old crossings.
15 cl, 2 dwg
Title | Year | Author | Number |
---|---|---|---|
ACOUSTIC PROCEDURE FOR DIAGNOSIS OF TECHNICAL STATE OF MAIN CROSSING OVER NATURAL OR ARTIFICIAL BARRIERS | 2010 |
|
RU2422719C1 |
METHOD OF FILLING BINDER WITH MATERIAL BETWEEN PIPELINE AND PROTECTIVE SHELL THEREOF AT TRENCHLESS PIPELINE LAYING AND DEVICE FOR IMPLEMENTATION THEREOF | 2019 |
|
RU2718861C1 |
CONTROL SYSTEM FOR GAS LEAKS AT GAS MAIN CROSSING MOTOR OR RAIL ROAD | 2010 |
|
RU2418235C1 |
PROCEDURE FOR DETERMINATION OF CONTACT PLACE OF PIPELINE WITH PROTECTIVE JACKET IN SYSTEM OF MAIN CROSSING OVER ROAD | 2010 |
|
RU2422718C1 |
METHOD OF MORTAR FILLING OF THE ANNULAR SPACE OF THE TUNNEL TRANSITION OF THE MAIN PIPELINE | 2015 |
|
RU2653277C2 |
SYSTEM FOR CONTROL AND ELIMINATION OF HAZARDOUS CONDITION OF MAIN | 2010 |
|
RU2422712C1 |
PIPE LINE PASS UNDER AUTOMOBILE ROAD | 1998 |
|
RU2186281C2 |
PIPELINE CROSSING UNDER ROADWAY | 1999 |
|
RU2179277C2 |
UNDERWATER PIPELINE | 2014 |
|
RU2554689C1 |
METHOD OF LAYING MAIN LINE ACROSS ROADS | 2012 |
|
RU2498142C1 |
Authors
Dates
2011-08-20—Published
2010-02-11—Filed