FIELD: mining industry. SUBSTANCE: process of opencast mining of steeply inclined kimberlite deposits includes working of stripping to project depth in stages with formation of flanks with parameters allowed by stability, liquidation of flanks, finishing of mass of mineral resource. Completion of stripping to project depth with formation and liquidation of flank are carried out before boundary of intermediate bottom of stripping is reached. Flank of stripping is built up by superhigh steep ledges under ultimate angle of liquidation at stag of finishing of mass of mineral resource in near-flank pillars, beneath boundary of intermediate bottom of stripping. EFFECT: process makes it possible to raise efficiency and completeness of excavation of stock of mineral resource with reduced extent of opencast mining and justified decrease of factor of stability margin at finishing stages. 1 dwg _
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR RECONSTRUCTING QUARRY WITH TWO PROXIMATE ORE BODIES | 2002 |
|
RU2230192C1 |
METHOD FOR OPENCAST STEEP DEPOSIT MINING | 2005 |
|
RU2294434C1 |
METHOD FOR OPEN EXTRACTION OF MINERAL RESOURCES DEPOSITS | 2003 |
|
RU2256795C1 |
RECONSTRUCTION METHOD FOR PIT HAVING TWO ORE BODIES ARRANGED ONE NEAR ANOTHER | 2006 |
|
RU2314420C1 |
OPENCAST WITH TWO CLOSELY LOCATED ORE BODIES DEVELOPMENT METHOD | 2008 |
|
RU2382200C1 |
OPEN DEVELOPMENT OF STEEP ORE BODIES | 2014 |
|
RU2571776C1 |
METHOD FOR COMPLETION OF OPEN PIT WITH TWO CLOSELY LOCATED ORE BODIES | 2013 |
|
RU2540735C1 |
METHOD OF COMBINED MINERAL DEPOSIT DEVELOPMENT | 2006 |
|
RU2331767C1 |
METHOD FOR EXTRACTING MINERAL RESOURCES DEPOSITS | 2003 |
|
RU2241119C1 |
METHOD FOR BUILDING NON-WORKING QUARRY EDGE | 2003 |
|
RU2246621C2 |
Authors
Dates
2002-02-27—Published
2000-01-06—Filed