FIELD: development of oil and gas fields. SUBSTANCE: proposed process can be used to maintain pressure in productive pools. It provides for installation of tubing string with packer in well cased by production string to separate interstring ring space. Forcing working substance is pumped through tubing string. Non-return valve is positioned in packer or tubing string to communicate interstring ring space with space of tubing string. Well is brought to stop when pressure in separated interstring space builds up to value critical for operation of production string and pressure in tubing string is reduced. Pressure in interstring ring space is dumped into tubing string. After it well is again brought into operation. EFFECT: exclusion of water leakage to rock surrounding well through leaks of string. 1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR DETERMINING TUBING TIGHTNESS IN INJECTION WELLS | 2018 |
|
RU2693090C1 |
METHOD OF HORIZONTAL WELL COMPLETION | 2000 |
|
RU2171359C1 |
METHOD FOR OIL EXTRACTION | 2002 |
|
RU2236560C2 |
OIL AND GAS DEPOSIT DEVELOPMENT METHOD | 2001 |
|
RU2260681C2 |
METHOD FOR PULSE EXCITATION OF OIL POOL | 1997 |
|
RU2151280C1 |
METHOD FOR CONTROLLING PRESSURIZATION OF FORCE WELL | 2004 |
|
RU2246613C1 |
WELL FORMATION DEVELOPMENT DEVICE | 2014 |
|
RU2553798C1 |
WATER AND GAS INFLUX LIMITING METHOD WITH WELL PRODUCTIVITY RECOVERY | 2013 |
|
RU2539047C1 |
METHOD OF GRAVEL FILTER CONSTRUCTION | 2007 |
|
RU2374431C2 |
DEVICE FOR DEVELOPMENT OF WELL WITH SWABBING | 2010 |
|
RU2432457C1 |
Authors
Dates
2002-03-10—Published
2000-04-10—Filed