METHOD FOR DETERMINING TUBING TIGHTNESS IN INJECTION WELLS Russian patent published in 2019 - IPC E21B47/117 

Abstract RU 2693090 C1

FIELD: oil and gas industry.

SUBSTANCE: invention relates to oil industry and can be used in operation of injection wells equipped with a tubing string (TS) and packer. Method for determining leak-tightness of tubing string in injection wells includes assembling at wellhead and lowering into well of tubing string with diameter of 48–114 mm with packer with diameter of 82–146 mm, pre-production string is templateed with length of 1–4 m, tubing string is assembled on high-tight couplings or couplings with sealant on thread, prior to installation of packer, pressure testing of pipes is performed in the following sequence, pressure line is assembled, pressure line is pressurized by 1.5 times pressure from planned pressure of pressure test TS, TS is pressurized to pressure of 100–250 atm (depending on operating conditions of pipes), during well operation after introduction of downhole pump equipment, an inadequate investigation of system tightness is performed TS-packer-EC, for this purpose well is stopped, recording of pressure change in intertube space overlapped with packer, and pressure measurement at wellhead inlet to tubing string, pressure change is recorded comparing pressure before and after well shutdown by rate of pressure drop at wellhead and in tube space after shutdown of operating well and comparing pressures before and after well start for injection by rate of pressure increase at wellhead and in annular space after well start-up for pumping, wherein when determining the tightness of the annular space after the criterion for evaluating tightness of the annular space, a design value of the flow rate of the fluid entering or leaving the annular space of the well is received, in system hermeticity TS-packer-EC and absence of excess pressure in annular space during operation (under condition of detected EC violations) TS pressurized are considered to be pressurized before PRS, RNC is not performed, if necessary for pressure testing TS before repair of wells after packer failure, pressing of system is performed TS-packer-EC with the help of pump unit by annular space at pressure allowable on EC 50–200 atm, at system tightness or pressure drop by 5 % TS hermetically sealed, when the system is unsealed, shut-off device of pressure testing valve is lowered into pipes, process fluid is pumped into TS to bring valve (shutoff element) to locking ring (seat), pressure is created in TS equal to 50–250 atm, held for 15–30 minutes, with pressure reduction in TS by 0–5 % TS sealed.

EFFECT: provides higher efficiency of method due to exclusion of well export from sound, tight TS and their subsequent expensive repair in specialized enterprises.

1 cl

Similar patents RU2693090C1

Title Year Author Number
METHOD FOR MONITORING TIGHTNESS OF INJECTION WELL (EMBODIMENTS) 2017
  • Popov Vitalij Grigorevich
  • Gabdullina Galiya Talgatovna
  • Zinnatullin Shamil Amirovich
  • Nazargalin Eduard Rustamovich
  • Ramazanov Ajrat Shajkhullinovich
RU2705683C2
METHOD OF TIGHTNESS TESTING OF INJECTION WELL 2013
  • Saetgaraev Rustem Khalitovich
  • Mavleev Ildar Alisovich
  • Akhmetzyanov Ruslan Robertovich
  • Malikov Marat Mazitovich
RU2551038C2
METHOD OF OPERATION OF AN INJECTION WELL OF A SMALL DIAMETER WITH A SINGLE LIFT TWO-PACKER ARRANGEMENT 2017
  • Galiev Marsel Ramilevich
  • Vakhitova Rimma Mederisovna
  • Malikov Marat Mazitovich
RU2678745C1
METHOD FOR PRESSURE TEST OF TUBING STRING 2011
  • Ibragimov Nail' Gabdulbarievich
  • Gabdrakhmanov Rinat Anvarovich
  • Ljubetskij Sergej Vladimirovich
  • Sterljadev Jurij Rafailovich
  • Zotov Aleksandr Maksimovich
  • Shajdullin Timur Faritovich
RU2455479C1
PRESSURE-TESTING METHOD FOR WELL PROVIDED WITH FLOW STRING 2006
  • Ibragimov Nail' Gabdulbarievich
  • Taziev Mirgazijan Zakievich
  • Zakirov Ajrat Fikusovich
  • Minnullin Rashid Mardanovich
  • Vil'Danov Rafaehl' Rasimovich
  • Kamil'Janov Timerbaj Sabir'Janovich
RU2310062C1
METHOD FOR CONTROLLING PRESSURIZATION OF FORCE WELL 2004
  • Ibragimov N.G.
  • Zakirov A.F.
  • Sharafutdinov Kh.U.
  • El'Ma I.Z.
  • Ozheredov E.V.
RU2246613C1
METHOD AND ARRANGEMENT FOR CONTROLLED INJECTION OF LIQUID THROUGH FORMATIONS 2017
  • Sulejmanov Ildar Amirovich
  • Gabdullin Bayazit Fazitovich
  • Khusainov Albert Railevich
RU2636842C1
METHOD FOR THERMOCHEMICAL TREATMENT OF AN OIL RESERVOIR 2021
  • Bogorodskij Mikhail Gennadevich
  • Kataev Aleksej Valerevich
  • Lishchuk Aleksandr Nikolaevich
  • Molchanov Artem Vladimirovich
  • Nagiev Ali Telman Ogly
  • Novikov Andrej Evgenevich
  • Rysev Konstantin Nikolaevich
  • Tarkin Yurij Ivanovich
RU2783030C1
METHOD OF WELL OPERATION 2007
  • Ibragimov Nail' Gabdulbarievich
  • Valeev Mudair Khajevich
  • Chernov Roman Viktorovich
  • Lazarev Boris Mikhajlovich
RU2335624C1
METHOD OF DIB HOLE PREPARATION FOR HYDRAULIC FRACTURING 2016
  • Ksenofontov Denis Valentinovich
  • Novikov Igor Mikhajlovich
  • Tabashnikov Roman Alekseevich
  • Minapov Ravil Ramilevich
  • Sabanov Aleksej Vasilevich
  • Adylgareev Irek Nagimovich
RU2622961C1

RU 2 693 090 C1

Authors

Galiev Marsel Ramilevich

Malikov Marat Mazitovich

Dates

2019-07-01Published

2018-07-26Filed