FIELD: oil and gas extractive industry.
SUBSTANCE: during recording of pressure change pressure is measured at mouth at tubing column entrance and in inter-tubular space. Recording of pressure change is performed on basis of pressures comparison before and after stopping of well on basis of speed of pressure fall at mouth and in inter-tubular space after stopping of operation well and on basis of pressures comparison before and after well launch for forcing on basis of speed of pressure increase at mouth and in inter-tubular space after well launch. As criterion of pressurization estimation a calculated value of liquid flow, which enters and exits inter-tubular well space is taken.
EFFECT: higher trustworthiness.
1 ex
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR OPERATION OF FORCE WELL | 2006 |
|
RU2290494C1 |
METHOD FOR DETERMINING TUBING TIGHTNESS IN INJECTION WELLS | 2018 |
|
RU2693090C1 |
METHOD FOR MONITORING TIGHTNESS OF INJECTION WELL (EMBODIMENTS) | 2017 |
|
RU2705683C2 |
PRESSURE-TESTING METHOD FOR WELL PROVIDED WITH FLOW STRING | 2006 |
|
RU2310062C1 |
METHOD OF TIGHTNESS TESTING OF INJECTION WELL | 2013 |
|
RU2551038C2 |
METHOD OF DETECTING CROSS-FLOWS IN WELL | 2008 |
|
RU2361079C1 |
WELL SURVEYING METHOD | 2013 |
|
RU2527960C1 |
METHOD OF WELL OPERATION | 2007 |
|
RU2335624C1 |
METHOD FOR PRESSURE TEST OF TUBING STRING | 2011 |
|
RU2455479C1 |
METHOD OF OPERATION OF THE INJECTION WELL WITH SIMULTANEOUS-SEPARATE INJECTION OF FLUID | 2018 |
|
RU2695910C1 |
Authors
Dates
2005-02-20—Published
2004-04-06—Filed