FIELD: mining industry; applicable in mining of compound morphology veins, particularly, with nonuniform thickness to the rise. SUBSTANCE: method includes driving of haulage drift, block raise, extraction of ore by inclined layers, ore partial shrinkage, drawing of ore excessive in breakage face space through ore chute. In mining of veins with nonuniform thickness to the rise, ore is extracted in two semiblocks with lengthening of central raise. At districts with reduced vein thickness below the minimum possible width of breakage space, rigid roofing is laid on shrinkage ore and selective extraction is made with broken rock left in semiblocks. At district of mining of veins with thickness corresponding to possible width of breakage face space and above, laid on broken rock is permanent flooring, and at point of joint of permanent flooring with ore cute, chute door is installed. EFFECT: reduced impoverishment of ore. 2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF DEVELOPMENT OF STEEP ORE | 2007 |
|
RU2352778C1 |
METHOD OF DEVELOPMENT OF STEEP ORE BODY | 2007 |
|
RU2350750C1 |
METHOD OF UNDERGROUND MINING OF STEEP FIELD OF FIRM MINERAL | 2007 |
|
RU2334875C1 |
MINING METHOD FOR STEEP ORE BODIES | 2007 |
|
RU2325529C1 |
DEVELOPMENT METHOD OF STEEPLY-DIPPING ORE BODIES | 2008 |
|
RU2386031C1 |
METHOD FOR DEVELOPING LOW-POWERED STEEL ORE BODIES | 2021 |
|
RU2757619C1 |
PROCESS OF DEVELOPMENT OF COMPLEX-STRUCTURED DEPOSITS | 2002 |
|
RU2223401C2 |
METHOD FOR DISCHARGING OF BROKEN ORE CONTAINING CLAY MATERIAL | 2003 |
|
RU2232273C1 |
METHOD FOR EXTRACTION OF STEEPLY DIPPING ORE BODIES | 2003 |
|
RU2236591C1 |
EXCAVATION METHOD OF HEAVY-PITCHING THICK AND AVERAGE THICK ORE DEPOSITS WITH COMPLICATED STRUCTURE | 2006 |
|
RU2327038C1 |
Authors
Dates
2002-08-20—Published
2001-02-19—Filed