FIELD: ice-breaking jobs. SUBSTANCE: submarine vessel 2 is set in motion under ice 1 at safe depth and resonance speed exciting flexural gravitational waves 3; during motion of vessel 2, film 5 at high specific gravity is thrown from hull of vessel during her motion, thus decreasing depth of water under ice. EFFECT: enhanced efficiency of breaking ice cover. 1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF BREAKING ICE COVER | 2001 |
|
RU2194120C2 |
METHOD OF BREAKING ICE COVER | 2001 |
|
RU2194119C2 |
METHOD OF BREAKING ICE COVER | 2000 |
|
RU2194117C2 |
METHOD OF BREAKING ICE COVER | 2001 |
|
RU2194122C2 |
METHOD OF BREAKING ICE COVER | 2001 |
|
RU2188903C1 |
METHOD OF BREAKING ICE COVER | 2001 |
|
RU2188901C1 |
METHOD OF BREAKING ICE COVER | 2001 |
|
RU2188899C1 |
METHOD OF BREAKING ICE COVER | 2001 |
|
RU2194121C2 |
METHOD OF BREAKING ICE COVER | 2001 |
|
RU2194123C2 |
METHOD OF BREAKING ICE COVER | 1998 |
|
RU2137668C1 |
Authors
Dates
2002-09-10—Published
2001-02-13—Filed