FIELD: construction of piles foundation. SUBSTANCE: process includes drilling of hole, setting of reinforcement in the form of tube, injection of cement-sand mud till pure solution erupts from hole mouth and pressure testing of hole. Novelty of process lies in manufacture of reinforcement skeleton in the form of tube-injector with broadened, sharpened tip with injection holes. Tube-injector is sunk into hole to projected depth. In this case diameter of tube-injector is twice-three times smaller than diameter of hole. Broadened, sharpened tip has diameter 0.8-0.9d and height 4.0-5.0d, where d is diameter of hole. Injection holes have diameter 0.08-0.12d and are positioned in staggered arrangement at distance 0.5-1.0d from lower end of tube-injector. Injection holes with diameter 0.08-0.11d are located in upper part of broadened tip. EFFECT: enhanced bearing capacity of pile. 6 dwg
Title | Year | Author | Number |
---|---|---|---|
INJECTION PILE AND RETAINING WALL BUILT OF PILE FOUNDATION | 2004 |
|
RU2281997C2 |
METHOD OF MAKING A ROOT PILE WITH CONTROLLED BROADENING | 2015 |
|
RU2605474C2 |
MANUFACTURING METHOD OF INCLINED PILE WITH CONTROLLED WIDENING | 2012 |
|
RU2522358C1 |
DRILLED INJECTION PILE | 2023 |
|
RU2824061C1 |
METHOD OF INJECTION PILE BUILDING | 2003 |
|
RU2238366C1 |
METHOD OF ARRANGING INJECTION PILE | 2016 |
|
RU2637002C1 |
BORED PILE WITH WIDENING | 2023 |
|
RU2824059C1 |
METHOD FOR ERECTION OF BORED PILE WITH SOIL-CEMENT BROADENINGS IN WEAK SOILS ZONE AND DEVICE FOR ITS IMPLEMENTATION (VERSIONS) | 2019 |
|
RU2725363C1 |
METHOD FOR PRODUCING A CLAY SOIL PILE | 2020 |
|
RU2767469C1 |
METHOD FOR CONSTRUCTION OF INJECTION PILE | 2014 |
|
RU2550620C1 |
Authors
Dates
2002-09-10—Published
2001-02-14—Filed