FIELD: construction.
SUBSTANCE: method for arranging an injection pile, according to which the well arrangement is carried out without excavation by means of pressing an injector pipe with a conical tip consisting of a disk and cutting plates, with simultaneously cutting longitudinal grooves on the well walls and forming a gap between the walls of a well to be made and the injector pipe. After immersing the injector pipe to the design mark, a hardening grout is injected under pressure into it, filling the arranged well with the grout, the soil area around the well and below being compacted. An unperforated injector pipe with a cylindrical widening at the bottom, the ends of which are chamfered towards the injection tube, forming the upper and the lower cones, is pressed into the soil. After immersing to the design mark, the injector pipe is removed from the well, leaving a tip in the well. Injecting the hardening grout is carried out simultaneously with extracting the injector pipe, filling the well with the hardening grout bottom-up. The soil area around the well is compacted while pressing and removing the injection pipe from the well with the surfaces of the lower and the upper cones of the injector pipe widening, respectively. After extracting the injector pipe, a reinforcement framework is immersed into the hardening grout.
EFFECT: increasing the carrying capacity of the foundation, manufacturability of its production in weak soils.
3 cl, 8 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR CONSTRUCTION OF INJECTION PILE | 2014 |
|
RU2550620C1 |
INJECTION PILE AND THE METHOD FOR ITS INSTALLATION | 2021 |
|
RU2771363C1 |
METHOD OF PILE PRODUCTION BY IMPRESSION | 2013 |
|
RU2554368C2 |
METHOD FOR INJECTION PILE BUILDING (VARIANTS) | 2004 |
|
RU2263745C1 |
METHOD OF PRODUCING PILE BY IMPRESSION | 2015 |
|
RU2595102C1 |
METHOD OF INJECTION PILE BUILDING | 2003 |
|
RU2238366C1 |
PIPE CONCRETE PILE WITH REINFORCED BASE AND METHOD OF ITS ERECTION | 2011 |
|
RU2492294C1 |
BORED PILE WITH WIDENING | 2023 |
|
RU2824059C1 |
METHOD TO PRODUCE ROOT PILES | 2014 |
|
RU2551590C1 |
CONTINUOUS HOLLOW DIE FOR INSTALLATION OF CAST-IN-PLACE PILES BY INDENTATION METHOD AND METHOD OF CAST-IN-PLACE PILE INSTALLATION BY MEANS OF CONTINUOUS HOLLOW DIE FOR CAST-IN-PLACE PILES BY INDENTATION | 2023 |
|
RU2817367C1 |
Authors
Dates
2017-11-29—Published
2016-11-30—Filed