FIELD: oil and gas producing industry; applicable in well tapping. SUBSTANCE: in well completion, selected for tapping is formation with low pressure. Well is cased, and annulus is cemented. Well is filled with fluid to increase hydrostatic pressure over formation pressure. Well bottom is filled with aqueous solution of surfactant with intensifying component. Longitudinal slots are punctured in casing string, within interval of producing formation. After formation of longitudinal slots, jet fluid for washing out of caverns in annular space is used in the form of aqueous solution of surfactant with intensifying component. Speed of motion of jet type nozzle is maintained within 15-25 mm/min and jet fluid flow rate of 2-3 l/s with wellhead pressure of 12-15 MPa. After washing out of cavern in annular space, well is let to stand for technological purposes, and then well is completed. EFFECT: increased productivity of wells in zone of formations with low formation pressure. 1 ex
Title | Year | Author | Number |
---|---|---|---|
METHOD OF INJECTING INTO WELLS | 1994 |
|
RU2109128C1 |
METHOD FOR COMPLETING AND INTENSIFYING INFLOW OF WELL WITH CARBONATE RESERVOIRS | 2020 |
|
RU2750004C1 |
WELL BOTTOM ZONE TREATMENT METHOD | 2005 |
|
RU2296217C1 |
METHOD OF COMPLETING AND OPERATION OF WELL OF UNDERGROUND GAS STORAGES | 2018 |
|
RU2686259C1 |
METHOD FOR COMPLETION OF HORIZONTAL WELL OF SMALL DIAMETER | 2012 |
|
RU2490426C1 |
HORIZONTAL WELL COMPLETION METHOD | 2015 |
|
RU2588108C1 |
METHOD OF ISOLATION OF BEDS WITH WATER FLOWS | 2000 |
|
RU2191886C2 |
METHOD FOR PERFORATING A WELL AND PROCESSING A BOTTOM-HOLE CARBONATE FORMATION ZONE | 2017 |
|
RU2656255C1 |
METHOD FOR SECONDARY PRODUCTIVE FORMATION EXPOSING BY SLOT HYDRAULIC JET PERFORATION AND WELL PUTTING IN OPERATION | 2005 |
|
RU2282714C1 |
METHOD OF STABILISATION OF PRODUCING FORMATION WITH UNSTABLE ROCKS | 2011 |
|
RU2464410C1 |
Authors
Dates
2002-09-20—Published
2001-12-19—Filed