FIELD: oil and gas production industry. SUBSTANCE: this is used for increasing oil recovery from oil bed. According to method, after opening of oil bed, casing string is lowered into well. Prior to that, casing string is provided with hydraulic giant nozzles which are plugged by stoppers soluble in acids. Then casing string is cemented with isolation of productive part of bed from cement slurry. Stoppers are dissolved and effected is hydraulic jet perforation. This is performed through hydraulic giant nozzles. Preliminarily space inside casing string is subjected to packing. EFFECT: higher efficiency. 4 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR ISOLATION OF BEDS IN WELL | 1995 |
|
RU2095542C1 |
DEVICE FOR COMPLETION OF WELLS | 1995 |
|
RU2095545C1 |
ARRANGEMENT FOR INSULATING STRATA | 1995 |
|
RU2098602C1 |
PLUGS REMOVING METHOD FROM PERFORATED SHANK HOLES WHILE PUMPING HORIZONTAL WELL IN BITUMEN DEPOSIT | 2016 |
|
RU2626496C1 |
METHOD OF HORIZONTAL WELL COMPLETION | 2000 |
|
RU2171359C1 |
METHOD FOR WELL COMPLETION | 2013 |
|
RU2527978C1 |
COUPLING FOR STEPPED CEMENTING CASING STRINGS | 1994 |
|
RU2074311C1 |
METHOD OF SEGREGATION OF FORMATIONS IN WELL | 1999 |
|
RU2183265C2 |
WELL BOTTOM ZONE TREATMENT METHOD | 2005 |
|
RU2296217C1 |
METHOD FOR SELECTIVE ISOLATION OF PRODUCTIVE RESERVOIR AT CEMENTATION OF PRODUCTION STRING | 1993 |
|
RU2087674C1 |
Authors
Dates
1998-04-20—Published
1994-07-27—Filed