PROCESS OF EXTRACTION OF WORM FLUID FROM WELL AND GEAR FOR ITS REALIZATION Russian patent published in 2002 - IPC

Abstract RU 2190084 C2

FIELD: oil and gas production. SUBSTANCE: in correspondence with invention heat insulation is put on suction pipe. Suction pipe is run to depth of raised temperature of fluid. Lower part of suction pipe expands in the form of cone to area exceeding clearance area between cone and well column. Holes are drilled in upper part of pipe, beneath face of well-head. Discharge pipe is placed on well-head between face of well-head and holes in suction pipe. Fluid is poured into hole to face of well-head. Discharge pipe is opened and fluid is removed from well. Productivity of extraction of worm fluid is secured by section of pipes and filter in well. Temperature of worm fluid is controlled by depth of setting of suction pipe. EFFECT: potential for extraction of warm fluid of any calculated temperature without pumps. 2 cl, 1 dwg

Similar patents RU2190084C2

Title Year Author Number
METHOD OF OIL PRODUCTION 2000
RU2177534C2
METHOD OF LIQUID MINERAL RECOVERY 2001
RU2199001C1
NOZZLE FOR TUBING 2000
RU2183732C2
METHOD OF COMPLETING OIL OR GAS WELL AND DEVICE FOR ITS EMBODIMENT 2000
RU2183730C2
METHOD OF OIL RECOVERY 2000
RU2172390C1
METHOD OF INTENSIFYING OIL AND GAS RECOVERY 2000
RU2188934C2
PROCESS OF COMPLETION OF NON-FLOWING WELL 2001
RU2190085C1
METHOD OF WELL SWABBING 2000
RU2172392C1
INTENSIFICATION METHOD FOR FLUID EXTRACTION FROM WELL 2002
RU2224093C2
METHOD OF COMPLETING OIL WELL AND DEVICE FOR ITS EMBODIMENT 2000
RU2183731C2

RU 2 190 084 C2

Authors

Dates

2002-09-27Published

2000-10-03Filed