FIELD: oil and gas industry, both completion of wells and extraction of oil from non-flowing wells. SUBSTANCE: process includes flushing, perforation, forced, thermal and chemical action on pool to prompt inflow with the aid of equipment for completion. In agreement with invention first equipment for oil extraction, pump for oil production included, is installed in well. Then hole is made in it to put through equipment for completion. Completion operations are executed by equipment prepared for joint operations of completion and production. Both types of equipment are used in this case. Immediately after prompting inflow oil extraction is started without stopping inflow and removal of equipment for completion or with its partial removal through presenter and lubricator. EFFECT: possibility of transfer from completion of well to extraction of oil without stopping oil inflow. 1 cl, 1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF OIL WELL COMPLETION | 2000 |
|
RU2178063C2 |
METHOD OF OIL RECOVERY | 2000 |
|
RU2172390C1 |
OIL WELL SWABBING METHOD | 2004 |
|
RU2270912C1 |
METHOD OF COMPLETING OIL WELL AND DEVICE FOR ITS EMBODIMENT | 2000 |
|
RU2183731C2 |
METHOD OF COMPLETING OIL OR GAS WELL AND DEVICE FOR ITS EMBODIMENT | 2000 |
|
RU2183730C2 |
METHOD OF WELL SWABBING | 2000 |
|
RU2172392C1 |
METHOD OF INTENSIFYING OIL AND GAS RECOVERY | 2000 |
|
RU2188934C2 |
NOZZLE FOR TUBING | 2000 |
|
RU2183732C2 |
INTENSIFICATION METHOD FOR FLUID EXTRACTION FROM WELL | 2002 |
|
RU2224093C2 |
METHOD OF WELL SURVEYING ON DEPRESSION PRIOR TO BEGINNING OF PRODUCTION, AND DEVICE FOR ITS IMPLEMENTATION | 2009 |
|
RU2399759C1 |
Authors
Dates
2002-09-27—Published
2001-01-09—Filed