FIELD: mining industry, metallurgy. SUBSTANCE: method involves charging basic raw material in column onto false bottom; supplying leaching solution from the bottom into column; upon introducing required amount of leaching solution at liquid : solid ratio of (0.25-0.5) : 1, interrupting supplying of leaching solution. As a result of processing basic material with leaching solution, productive solution and sludge are obtained. Method further involves washing sludge with ascending flow of washing solution and simultaneously displacing leaching solution, with flow speed of leaching and washing solutions being below basic material fluidizing rate. In case of complex metal extraction, basic material is processed with two or more leaching solutions supplied one after another. EFFECT: reduced consumption of leaching solution, increased concentration of useful components in productive solution. 4 cl, 1 dwg, 4 tbl
Title | Year | Author | Number |
---|---|---|---|
METHOD OF EXTRACTING MINERALS BY MEANS OF LEACHING | 1995 |
|
RU2095438C1 |
METHOD OF HEAP LIXIVIATION | 1995 |
|
RU2095562C1 |
METHOD TO LEACH METALS FROM ORES, TAILINGS AND CONCENTRATES AND A DEVICE TO IMPLEMENT IT | 1993 |
|
RU2025512C1 |
LOOSE MATERIAL AIRLIFTING DEVICE | 1995 |
|
RU2132297C1 |
METHOD OF BURYING UNDERWATER OBJECTS | 2007 |
|
RU2355058C1 |
METHOD OF CONDUCTING MASS-TRANSFER PROCESSES AND APPARATUS THEREFOR | 2014 |
|
RU2558594C1 |
METHOD OF COMBINED DEVELOPMENT OF GOLD DEPOSITS | 2018 |
|
RU2687715C1 |
CHARGE-EXCHANGE RESERVOIR OF INSTALLATION FOR HYDRAULIC TRANSPORTATION OF LOOSE MATERIALS | 1993 |
|
RU2077465C1 |
DEVICE TO FIX SOIL | 1993 |
|
RU2036272C1 |
METHOD FOR EXTRACTION OF GOLD FROM CLAY ORE AND TECHNOGENIC RAW MATERIAL | 2012 |
|
RU2496891C1 |
Authors
Dates
2002-10-10—Published
2001-04-23—Filed