FIELD: operation of oil wells, particularly, research of operating wells. SUBSTANCE: device has ejector pump with active nozzle, mixing chamber, diffuser and channel for supply of fluid pumped out of formation and shutoff member with seat installed parallel to ejector pump. In this case, logging cable with connected geophysical instrument is passed through axial channel of shutoff member. Active nozzle with mixing chamber is directed upward. Installed in gap between ejector pump casing and casing string well, against mixing chamber is self-sealing collar. EFFECT: higher efficiency and reliability. 1 dwg
Title | Year | Author | Number |
---|---|---|---|
DEVICE FOR WELL RESEARCH | 2001 |
|
RU2194854C1 |
JET ASSEMBLY FOR CHEMICAL TREATMENT OF BOTTOMHOLE ZONE | 2006 |
|
RU2330995C1 |
METHOD OF OIL AND GAS INFLUX DEVELOPMENT AND INTENSIFICATION, WATERPROOFING PROCEDURE AND RELATED DEVICE FOR IMPLEMENTATION THEREOF | 2006 |
|
RU2345214C2 |
PROCESS OF ACCEPTANCE AND EXAMINATION OF WELLS, OF INTENSIFICATION OF OIL AND GAS INFLOWS, OF CONDUCTING WATER- INSULATION WORK AND GEAR FOR IMPLEMENTATION OF PROCESS | 2001 |
|
RU2179631C1 |
OIL-WELL PUMPING UNIT | 2000 |
|
RU2171920C1 |
OPERATING METHOD OF WELL JET PUMP UNIT DURING HYDRAULIC FRACTURING OF FORMATIONS | 2019 |
|
RU2705708C1 |
DEVICE FOR THE DEVELOPMENT, PROCESSING AND SURVEYING OF WELLS | 2016 |
|
RU2650158C1 |
WELL JET PLANT FOR SELECTIVE TESTING OF FORMATIONS | 2016 |
|
RU2631580C1 |
METHOD OF REPAIR OF OIL AND / OR GAS WELLS AND DEVICE FOR ITS IMPLEMENTATION (OPTIONS) | 2017 |
|
RU2667171C1 |
METHOD FOR TREATMENT OF BOTTOMHOLE ZONE AND DEVELOPMENT OF WELLS AND JET INSTALLATION FOR IMPLEMENTATION THEREOF | 2021 |
|
RU2822423C2 |
Authors
Dates
2002-12-20—Published
2001-07-26—Filed