FIELD: operation of oil wells, particularly, producing well logging. SUBSTANCE: device has packer installed on pipe string jet pump with active nozzle, mixing chamber, diffuser and shutoff member with seat installed parallel to jet pump. Passed through axial channel of shutoff member is logging cable connected to geophysical instrument. Packer is inflated by fluid pressure and installed on jet pump casing against mixing chamber where jet pump casing has holes for supply of working fluid to packer. EFFECT: reduced time for setting and removal of packer and higher pumping capacity of jet pump. 2 cl, 1 dwg
Title | Year | Author | Number |
---|---|---|---|
DEVICE FOR WELL RESEARCH | 2001 |
|
RU2194853C1 |
METHOD OF OIL AND GAS INFLUX DEVELOPMENT AND INTENSIFICATION, WATERPROOFING PROCEDURE AND RELATED DEVICE FOR IMPLEMENTATION THEREOF | 2006 |
|
RU2345214C2 |
JET ASSEMBLY FOR CHEMICAL TREATMENT OF BOTTOMHOLE ZONE | 2006 |
|
RU2330995C1 |
PROCESS TO RUN IN, TO EXAMINE WELLS AND TO INTENSIFY OIL AND GAS INFLUXES AND GEAR TO REALIZE IT | 1999 |
|
RU2160364C1 |
PROCESS OF ACCEPTANCE AND EXAMINATION OF WELLS, OF INTENSIFICATION OF OIL AND GAS INFLOWS, OF CONDUCTING WATER- INSULATION WORK AND GEAR FOR IMPLEMENTATION OF PROCESS | 2001 |
|
RU2179631C1 |
DEVICE FOR WELL COMPLETION AND INTENSIFICATION OF INFLOW OF FORMATION FLUID | 1998 |
|
RU2161699C2 |
DEVICE FOR THE DEVELOPMENT, PROCESSING AND SURVEYING OF WELLS | 2016 |
|
RU2650158C1 |
OPERATING METHOD OF WELL JET PUMP UNIT DURING HYDRAULIC FRACTURING OF FORMATIONS | 2019 |
|
RU2705708C1 |
METHOD OF DEVELOPMENT AND EXPLORATION OF WELLS AND OF INTENSIFYING OF OIL-GAS INFLUX OF HEAVY HIGH VISCOUS OILS AND FACILITY FOR IMPLEMENTATION OF THIS METHOD | 2007 |
|
RU2340769C1 |
METHOD FOR WELL EXPLORATION AND STIMULATION OF OIL AND GAS INFLOWS AND A JET PUMP FOR ITS IMPLEMENTATION | 2022 |
|
RU2795009C1 |
Authors
Dates
2002-12-20—Published
2001-07-26—Filed