FIELD: construction of foundations in permafrost. SUBSTANCE: proposed method includes rotation of pile in permafrost forming circular heating zone at simultaneous axial feed of pile at applied pressing load. Axial feed of pile is adjusted according to relationship given in description. EFFECT: continuity and enhanced efficiency of process. 1 tbl
Title | Year | Author | Number |
---|---|---|---|
PILE AND METHOD OF ITS INSTALLATION INTO PERMAFROST SOIL | 2010 |
|
RU2441116C1 |
METHOD OF INSTALLING TUBULAR PILE IN PERMANENTLY FROZEN EARTH | 2007 |
|
RU2349707C1 |
METHOD OF SINKING TUBULAR PILE INTO PERMAFROST GROUND | 1996 |
|
RU2109881C1 |
HYDRAULIC HAMMER | 1996 |
|
RU2109106C1 |
STRUCTURE OF TUBULAR PILE WITH PROTECTIVE COAT AND PROCEDURE OF ITS SINKING INTO PERMAFROST | 2001 |
|
RU2202680C2 |
METHOD FOR CONSTRUCTION OF CAST-IN-PLACE PILE | 1994 |
|
RU2087617C1 |
METHOD FOR DETERMINING THE SPECIFIC RESISTANCE FORCES ON THE SIDE SURFACE OF THE FOUNDATION OF FROZEN SOILS AT DIFFERENT TEMPERATURES IN THE PROCESS OF THAWING AND APPARATUS FOR IMPLEMENTATION THEREOF | 2020 |
|
RU2761782C1 |
DEVICE FOR TRANSMISSION OF IMPACT ENERGY IN PIPE-DRIVING HAMMERS AND OTHER PERCUSSIVE MECHANISMS | 1994 |
|
RU2078175C1 |
METHOD FOR INSTALLATION OF SCREW PILE IN PERMAFROST SOILS AND HELICAL SCREW FOR IMPLEMENTATION OF METHOD | 2022 |
|
RU2786081C1 |
HYDRAULIC HAMMER | 1996 |
|
RU2109105C1 |
Authors
Dates
2003-02-27—Published
2001-03-28—Filed