FIELD: construction engineering; restoration of building foundations. SUBSTANCE: proposed method consists in making boreholes which are filled with cementing mortar. Novelty of invention consists in drilling borehole first without extension from foundation body followed by charging cementing mortar by short descending stopes monolithizing foundation body, after which boreholes are drilled through cement stone thus formed extending to ground and second protective layer is formed by forcing cement mortar in required portion adjustable in pressure, density and concentration and compacting the ground in area of ground- foundation contact. EFFECT: enhanced reliability. 2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR CONSTRUCTION OF PILE AND COLUMNAR FOUNDATIONS IN PERMAFROST ZONE | 2023 |
|
RU2813086C1 |
METHOD OF STRENGTHENING FOUNDATION | 2017 |
|
RU2642762C1 |
METHOD OF SOIL REINFORCEMENT | 2010 |
|
RU2439246C1 |
METHOD FOR ERECTION OF BORED PILE WITH SOIL-CEMENT BROADENINGS IN WEAK SOILS ZONE AND DEVICE FOR ITS IMPLEMENTATION (VERSIONS) | 2019 |
|
RU2725363C1 |
METHOD OF FOUNDATION REINFORCEMENT | 2009 |
|
RU2410492C1 |
METHOD FOR PRODUCING A CLAY SOIL PILE | 2020 |
|
RU2767469C1 |
MANUFACTURING METHOD OF INCLINED PILE WITH CONTROLLED WIDENING | 2012 |
|
RU2522358C1 |
METHOD OF MAKING A ROOT PILE WITH CONTROLLED BROADENING | 2015 |
|
RU2605474C2 |
METHOD OF DRILLING INJECTION PILE | 2023 |
|
RU2817842C1 |
METHOD TO MAINTAIN INITIAL STRESSED-DEFORMED CONDITION OF SOIL IN ZONE OF EXISTING BUILDING FOUNDATION | 2010 |
|
RU2422592C1 |
Authors
Dates
2003-02-27—Published
2001-12-24—Filed