FIELD: technology to build high-speed motor roads and equipment for their building. SUBSTANCE: method includes erection of bearing supports and mounting of span structure with use of mobile set of gantry type. Set to build motor road comes in the form of mobile, preferably, self-propelled gantry with shape of tunnel with control system that ensures passage of road transport going along existing road through it. Upper part of gantry has capability for mounting span structure of high-speed motor road above it. EFFECT: widened technological potential of high-speed motor road build under restricted conditions. 8 cl, 3 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD AND UNIT FOR CONSTRUCTION OF EXPRESSWAY AND EXPRESSWAY | 2001 |
|
RU2181396C1 |
HIGHWAY AND METHOD FOR INCREASING ECOLOGICAL SAFETY IN HIGHWAY ZONE | 2001 |
|
RU2188270C1 |
HIGH-SPEED MOTOR ROAD AND METHOD OF CONTROL OVER ITS CARRYING CAPACITY | 2001 |
|
RU2203355C1 |
SPORTING AND RECREATION COMPLEX " VOROBYEVY GORI "IN THE FORM OF BRIDGE PASSAGE OVER RIVER | 2003 |
|
RU2212492C1 |
OVERHEAD MOTOR ROAD OF MEGAPOLIS TRANSPORT COMPLEX AND METHOD OF CONTROL AND RELIEF OF PASSENGER, PASSENGER-AND-FREIGHT AND FREIGHT TRAFFIC FLOWS | 2000 |
|
RU2198976C2 |
MOTOR ROAD AND METHOD OF OPERATION OF MEGAPOLIS HIGHWAY | 2000 |
|
RU2198977C2 |
SPORTS CENTER WITH ROOFED-IN SLEDDING-AND-BOBSLEIGH PATH | 2004 |
|
RU2257440C1 |
METHOD OF CONSTRUCTING AN UNDERPASS IN THE EMBANKMENT OF OPERATING RAILWAY | 0 |
|
SU863755A1 |
RING HIGHWAY OF MEGAPOLICE AND METHOD FOR ITS RECONSTRUCTION | 1998 |
|
RU2136803C1 |
TRANSPORTATION COMPLEX OF MEGAPOLICE AND METHOD FOR REGULATING AND RELIEVING PASSENGER, CARGO-PASSENGER AND CARGO TRAFFIC FLOWS IN IT | 1998 |
|
RU2135670C1 |
Authors
Dates
2003-04-27—Published
2001-08-20—Filed