FIELD: oil industry. SUBSTANCE: method ensures stabilization or increase of formation pressure by deformation of solid phase of formation. According to method productive pool is drilled in by operating holes. Oil is recovered and elevated to surface at the cost of pool energy or by mechanized methods. In correspondence with proposed method oil field is developed first by isolated blocks of first priority with their parameters taking into account number, width and extent and ensuring relieving of productive pool over developed area from formation pressure. Later development is carried out by blocks of second priority positioned between blocks of first priority. EFFECT: increased completeness of extraction of oil from productive pool. 1 cl, 2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF FLUIDS DEPOSITS DEVELOPMENT | 2001 |
|
RU2199002C2 |
DEEP-WELL SUCKER-ROD PUMPING UNIT | 2001 |
|
RU2205979C1 |
METHOD OF WELL SWABBING | 2000 |
|
RU2181830C1 |
METHOD OF CONTROLLING RATE OF INCREASING PRESSURE OF WATER INJECTION INTO CARBONATE RESERVOIRS | 2023 |
|
RU2821875C1 |
METHOD FOR SECONDARY TWO-PHASE SATURATED FORMATION PENETRATION | 2003 |
|
RU2262592C2 |
METHOD FOR MOUNTING PIPELINE IN GROUND | 2000 |
|
RU2172443C1 |
METHOD FOR UNDERGROUND DEVELOPMENT OF ORE DEPOSITS | 1992 |
|
RU2148712C1 |
METHOD FOR INTENSIFYING INFLOW OF HYDROCARBONS TO WELL | 1998 |
|
RU2127806C1 |
DEVICE FOR SETTING BED PRESSURE IN OIL DEPOSIT | 1997 |
|
RU2108460C1 |
METHOD OF TRANSPORTATION OF COMPRESSED GAS | 2000 |
|
RU2179684C1 |
Authors
Dates
2003-04-27—Published
2001-05-30—Filed