FIELD: mining industry, underground development of deposits of mineral wealth with filling of worked-out space. SUBSTANCE: stowage material includes crushed rock that forms laid rock mass and hardening solution injected into pores. Rock with granulometric composition ensuring formation of stowage material with porosity 7-15% after vibration laying is employed in the capacity of crushed rock. Process of laying of stowage material into worked-out space includes feed of crushed rock into worked-out space, its laying with formation of laid mass, installation of injectors in mass and injection of solidifying solution into pores of laid mass. Uniformly distributed vibration action is carried out simultaneously with laying of crushed rock in part of its volume to lay crushed rock mass with maximum possible coefficient of relative density of laying. Solidifying solution per each section can be selected depending on state of ore in roof and stressed state of mass in it. EFFECT: increased bearing capacity of laid mass, reduced consumption of solidifying solution and simplified technology of filling of worked-out space. 33 cl
Title | Year | Author | Number |
---|---|---|---|
METHOD OF LAYER MINING OF KIMBERLITE PIPE BY RAISING AND FILLING | 2001 |
|
RU2186981C1 |
PROCESS OF LAYER-BY-LAYER DEVELOPMENT OF KIMBERLITE PIPE IN ASCENDING ORDER WITH BACKFILL AND POWERED COMPLEX FOR METHOD EMBODIMENT | 2001 |
|
RU2203420C2 |
BACKFILLING MASS ERECTION METHOD | 2015 |
|
RU2602565C1 |
METHOD FOR DEVELOPING KIMBERLITE PIPE IN ASCENDING PROCEDURE WITH DRY GOBBING | 1997 |
|
RU2132461C1 |
PROCESS OF FILLING OF WORKED-OUT SPACE WHILE DEVELOPING KIMBERLITE PIPE BY POWERED MINING COMPLEX IN RISING STRATUM AND GEAR TO CONDUCT FILLING OPERATION | 1998 |
|
RU2164297C2 |
METHOD AND POWERED COMPLEX FOR MINING KIMBERLITE PIPES | 1996 |
|
RU2116447C1 |
METHOD AND DEVICE FOR CONSTRUCTION OF TUNNEL IN LOOSE GROUND | 1998 |
|
RU2138643C1 |
METHOD FOR DEVELOPMENT OF STEEP ORE BODIES | 1996 |
|
RU2117761C1 |
METHOD OF ROCKS BREAKAGE | 2000 |
|
RU2167293C1 |
METHOD OF MAKING LARGE-VOLUME CAVITY IN ROCKS | 0 |
|