FIELD: construction industry. SUBSTANCE: novelty of process consists in arrangement of expansion-contraction joints over entire width of grip and over entire thickness of concrete layer without violation of continuity of reinforced cage prior to laying concrete in forms dividing grip along its long side into internal, end-free and end-not free sections held rigidly by butts. Length of internal and end-free sections is equal to L, length of end-not free sections is L/2. Value L is found from condition 15≥L≤kh where h is width of grip, m; k = 0.8-1.5 is correction factor depending on local conditions. EFFECT: prolonged service life and quality of erected structure by reduced crack formation. 1 cl, 8 dwg
Title | Year | Author | Number |
---|---|---|---|
PROCESS OF LAYING CONCRETE ON MONOLITHIC REINFORCED CONCRETE BUILDING STRUCTURES EXTENDED IN AREA | 2001 |
|
RU2211892C2 |
PROCESS OF ERECTION OF FLOORS OF MONOLITHIC REINFORCED BUILDING STRUCTURES | 2001 |
|
RU2206679C2 |
PROCESS OF ERECTION OF MONOLITHIC REINFORCED CONCRETE BRIDGE SUPPORTS-WALLS | 2001 |
|
RU2208082C2 |
CAST-IN-PLACE TWO-LAYERED REINFORCED CONCRETE PANEL | 2003 |
|
RU2243316C1 |
EXPANSION-SHRINKAGE JOINT | 2001 |
|
RU2202673C2 |
METHOD FOR ERECTING MONOLITHIC REINFORCED CONCRETE STRUCTURES | 2016 |
|
RU2618552C1 |
METHOD FOR PRESTRESSING OF SOLID REINFORCED - CONCRETE SLABBED DOUBLE-FRAMEWORK BRIDGES | 1999 |
|
RU2152476C1 |
METHOD FOR PRESTRESSING OF MULTIPLE-SPAN UNSPLITTABLE REINFORCED CONCRETE SLAB-TYPE SUPERSTRUCTURES OF BRIDGES | 1999 |
|
RU2149944C1 |
METHOD FOR PRESTRESSING OF FRAMED REINFORCED CONCRETE SLAB-TYPE SUPERSTRUCTURES OF BRIDGES | 1999 |
|
RU2149236C1 |
METHOD FOR ERECTION OF BOX-TYPE MONOLITHIC GARAGES BY FLOW-LINE PROCEDURE | 1997 |
|
RU2105849C1 |
Authors
Dates
2003-07-10—Published
2001-09-13—Filed