FIELD: bridge construction. SUBSTANCE: process can find use in erection of various structures, in all cases when substantial interruption in laying concrete in foundation or chute on one side and walls of vault of tunnel or tube on other side is anticipated. Process includes operations of preparation of base for support-wall, mounting of attachments and reinforced cage for concrete laying in foundation and wall. Salient feature of process lies in that operation of preparation of base includes arrangement of thixotropic underlayer, concrete in foundation is laid in individual blocks along length of structure with arrangement of expansion joints between adjacent blocks. Length of each block encased in concrete is established from two conditions L≤15 m and L≤kh m where h is height of erected wall, m; k=0.8...1.5 is correction factor depending on local conditions. Wall is treated with concrete over entire length and height. EFFECT: increased resistance of monolithic reinforced structures to cracks. 4 dwg
Title | Year | Author | Number |
---|---|---|---|
PROCESS OF ENCASEMENT OF MONOLITHIC REINFORCED CONCRETE BUILDING STRUCTURE EXTENDED IN AREA IN CONCRETE | 2001 |
|
RU2208083C2 |
PROCESS OF ERECTION OF FLOORS OF MONOLITHIC REINFORCED BUILDING STRUCTURES | 2001 |
|
RU2206679C2 |
PROCESS OF LAYING CONCRETE ON MONOLITHIC REINFORCED CONCRETE BUILDING STRUCTURES EXTENDED IN AREA | 2001 |
|
RU2211892C2 |
METHOD FOR ERECTION OF CONCRETE BRIDGE PIER | 2000 |
|
RU2165491C1 |
SHUTTERING PANEL | 1998 |
|
RU2149243C1 |
METHOD OF BRIDGE BUILDING OVER WATER BODY | 2004 |
|
RU2237123C1 |
PROCESS OF TREATMENT OF MONOLITHIC STRUCTURES WITH CONCRETE | 2001 |
|
RU2208093C2 |
ARCH-TYPE FILLED BRIDGE | 1997 |
|
RU2107770C1 |
EXPANSION-SHRINKAGE JOINT | 2001 |
|
RU2202673C2 |
EQUIPMENT FOR HIGH GRATING OF BRIDGE PIERS BUILDING | 2003 |
|
RU2250948C1 |
Authors
Dates
2003-07-10—Published
2001-09-13—Filed