FIELD: civil engineering, erection of floors leaned against walls of building structures made of monolithic reinforced concrete. SUBSTANCE: length of structure is divided into sections separated by deformation joints and concrete is laid by sections. First extreme and internal walls of section are erected and length L of floor is treated with concrete. Prior to concrete laying section of floor is divided into individual bands, extreme bands border on walls, central bands are located in center of section and closing bands are arranged between extreme and central bands. First extreme and central bands are treated with concrete, closing bands are treated with concrete after cooling of extreme and central bands. Prior to concrete laying on extreme and closing bands expansion-shrinkage strips are arranged over entire width and thickness of concrete dividing them along their long side into sections with length Lk and Lex with adhering to condition 15≥Lk≥kh, m; Lk≥Lex>2kh m, where k=0.8-1.5 is correction factor depending on local conditions; hex≥0 is width of extreme band, m; hcl = 0,5-2,5 is width of closing band, m. EFFECT: raised quality and prolonged service life of structures by increase of their crack resistance. 12 dwg
Title | Year | Author | Number |
---|---|---|---|
PROCESS OF LAYING CONCRETE ON MONOLITHIC REINFORCED CONCRETE BUILDING STRUCTURES EXTENDED IN AREA | 2001 |
|
RU2211892C2 |
PROCESS OF ENCASEMENT OF MONOLITHIC REINFORCED CONCRETE BUILDING STRUCTURE EXTENDED IN AREA IN CONCRETE | 2001 |
|
RU2208083C2 |
PROCESS OF ERECTION OF MONOLITHIC REINFORCED CONCRETE BRIDGE SUPPORTS-WALLS | 2001 |
|
RU2208082C2 |
EXPANSION-SHRINKAGE JOINT | 2001 |
|
RU2202673C2 |
RECONSTRUCTION METHOD FOR BEAM BRIDGE | 2003 |
|
RU2237124C1 |
METHOD FOR ERECTION OF BOX-TYPE MONOLITHIC GARAGES BY FLOW-LINE PROCEDURE | 1997 |
|
RU2105849C1 |
CAST-IN-PLACE TWO-LAYERED REINFORCED CONCRETE PANEL | 2003 |
|
RU2243316C1 |
PROCESS OF TREATMENT OF MONOLITHIC STRUCTURES WITH CONCRETE | 2001 |
|
RU2208093C2 |
METHOD FOR PRESTRESSING OF SOLID REINFORCED - CONCRETE SLABBED DOUBLE-FRAMEWORK BRIDGES | 1999 |
|
RU2152476C1 |
METHOD OF TUNNEL TYPE POURED-IN-PLACE STRUCTURE CONCRETING IN ENLARGED BLOCKS WITH STEP-IN-STEP STRUCTURE COMPONENT ERECTION IN TOP-BOTTOM DIRECTION | 2003 |
|
RU2246588C1 |
Authors
Dates
2003-06-20—Published
2001-09-13—Filed