FIELD: gas handling facilities. SUBSTANCE: according to proposed method of assembling gas-transfer set units, charge and suction chambers are installed on base. Axis is marked by cross on suction chamber. Laser radiator is installed on cylindrical surface of locked shaft of charger. By displacing laser radiator around axis of charger shaft, value of displacement of suction chamber axis relative to axis of charger is found and spatial position of suction chamber is adjusted. EFFECT: reduced labor input at provision of required accuracy of installation of suction chamber relative to axis of charger. 3 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR ASSEMBLING GAS PUMPING AGGREGATE | 1999 |
|
RU2159871C1 |
METHOD OF GAS-PUMPING UNIT ASSEMBLY | 2007 |
|
RU2347112C1 |
TURBOSET OF GAS-COMPRESSOR UNIT | 1999 |
|
RU2170855C1 |
TURBOUNIT FOR GAS TRANSFER SET | 1997 |
|
RU2122143C1 |
CONNECTION UNIT FOR MODULAR MEMBERS OF GAS-TRANSFER PLANT | 1997 |
|
RU2123623C1 |
GAS COMPRESSOR PLANT TURBO UNIT | 2008 |
|
RU2383754C1 |
DRIVE TURBINE FOR GAS-TURBINE SET | 1998 |
|
RU2139433C1 |
TURBO-UNIT FRAME | 2003 |
|
RU2251032C1 |
JOINT OF FRAMED STRUCTURES | 1998 |
|
RU2140023C1 |
TURBO UNIT | 2013 |
|
RU2518919C1 |
Authors
Dates
2003-09-27—Published
2002-03-19—Filed