FIELD: oil-gas producing industry. SUBSTANCE: method includes determination of specific injectivity of insulating well, separation of wells with specific injectivity of less than 1.39 cu.m/hMPa; preparation of cement mortar by mixing of cement with water and its injection onto separated wells. Preliminarily cement mortar is divided into portions with different fractional composition of solid phase particles by its pumping into overaging vessel, process holding of it at rest in this vessel, and pumping out of if by portions successively from top down into separated wells successively beginning from portion containing particle minimal fractions. EFFECT: higher efficiency of method due to reduced labor input of repeated cementing under conditions with specific injectivity of insulating well under 1.39 cu. m/hMPa. 1 tbl, 1 ex
Title | Year | Author | Number |
---|---|---|---|
METHOD OF RECOVERY OF CASING SEALING | 2002 |
|
RU2211305C1 |
METHOD FOR REPAIR INSULATION WORK USING SUSPENSIONS OF FINE MINERAL BINDER | 2015 |
|
RU2582143C1 |
METHOD OF SHUTOFF OF WATER INFLOW INTO WELL | 1999 |
|
RU2158351C1 |
METHOD OF CEMENTING CASING STRING IN WELL | 2023 |
|
RU2823955C1 |
METHOD OF RECOVERY OF BOTTOM-HOLE FORMATION ZONE OF GAS WELL | 2000 |
|
RU2183724C2 |
WELL STRENGTHENING METHOD | 1994 |
|
RU2083802C1 |
METHOD OF WELL WATER PRODUCTION ZONE ISOLATION | 2012 |
|
RU2504640C1 |
WATER INFLOW ZONES CEMENTING METHOD | 2013 |
|
RU2533997C1 |
METHOD FOR REVERSE CEMENTING OF CASING IN WELL | 1994 |
|
RU2067158C1 |
PROCEDURE FOR RECOVERY OF TIGHTNESS IN FLOW STRING AND ELIMINATION OF BEHIND-CASING FLOWS | 2013 |
|
RU2518620C1 |
Authors
Dates
2003-10-20—Published
2002-02-28—Filed