FIELD: oil and gas industry. SUBSTANCE: this relates to drilling wells for oil, gas and water. According to method, casing string is lowered into bore-hole, and plugging solution is injected into hole clearance until it appears at bore-hole head. Plugging solution emerged at bore-hole head is injected again into casing string. Created is direct or return circulation of solution which is effected through averaging vessel installed at bore-hole head. In process of continuous circulation, plugging solution in averaging vessel is heated. Continuous circulation is performed stoplessly until plugging solution starts hardening. During this process, properties of plugging solution are being checked and regulated at bore-hole head at periods of heating plugging solution in averaging vessel. EFFECT: improved quality of well strengthening with levelling of periods of plugging solution hardening over entire height well shaft.
Title | Year | Author | Number |
---|---|---|---|
METHOD OF WELLS CEMENTING | 2006 |
|
RU2330935C2 |
METHOD OF CEMENTING CASING PIPE OF GAS WELL UNDER CONDITIONS OF PERMAFROST ROCKS | 2006 |
|
RU2342517C2 |
METHOD FOR REVERSE CEMENTING OF CASING IN WELL | 1994 |
|
RU2067158C1 |
METHOD OF FASTENING THE WELL WITH LEADER IN THE SECTION OF PERMAFROST WITH HIGH ICE CONTENT | 2017 |
|
RU2662830C1 |
METHOD OF WELL CEMENTING | 1998 |
|
RU2157881C2 |
PROCEDURE FOR WELL STABILISATION | 2010 |
|
RU2434120C1 |
METHOD OF RECOVERY OF BOTTOM-HOLE FORMATION ZONE OF GAS WELL | 2000 |
|
RU2183724C2 |
METHOD OF CEMENTING OF WELLS | 2006 |
|
RU2335618C2 |
DEVICE FOR STAGE CEMENTING OF WELL | 1992 |
|
RU2029066C1 |
METHOD OF CEMENTING OF WELLS WITH ABNORMALLY HIGH FORMATION PRESSURE | 1996 |
|
RU2100569C1 |
Authors
Dates
1997-07-10—Published
1994-07-20—Filed