FIELD: oil-and-gas industry.
SUBSTANCE: proposed method comprises making the mortar to be injected to well and forced into interval to be isolated. After injection of mortar into well in amount of 10% of total amount, portion of fibro fibers is added thereto under mortar jet. First portion of fibro fibers is fed in 3 mm length, minimum, and in minimum amount of 1 kg per 1 m of mortar. At insignificant increase in injection pressure, 2nd, 3rd and 4th portions of fibro fibers (6, 12, 18 mm-long) are added in portions of 2-5 kg per 1m of mortar till pressure of 70-90% of permissible pressure to operating string or to pools. Injection is terminated to force mortar with fibro fibers, process fluid to permissible pressure to string or to pools. Solution residues are washed off by back-flushing. Well is closed for mortar hardening period.
EFFECT: higher efficiency of isolation, fast process.
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR ISOLATING LOSS ZONES WHEN DRILLING WELLS | 2021 |
|
RU2768569C1 |
METHOD OF ISOLATION OF ABSORPTION ZONES DURING WELL DRILLING | 2020 |
|
RU2743123C1 |
WATER INFLOW ZONES CEMENTING METHOD | 2013 |
|
RU2533997C1 |
METHOD OF REPAIR AND INSULATION OPERATIONS IN A WELL | 2016 |
|
RU2618539C1 |
COMPOUND FOR ISOLATION OF WATER INFLOW AND ABSORBING ZONES IN WELL, AND ITS APPLICATION METHOD | 2011 |
|
RU2483093C1 |
METHOD OF CEMENTING CASING STRING IN WELL | 2023 |
|
RU2823955C1 |
METHOD FOR REPAIR AND INSULATION WORKS IN WELL | 2014 |
|
RU2580534C1 |
METHOD OF WATER INFLOW LIMITATION IN FLOODED CARBONE RESERVOIRS | 2016 |
|
RU2619778C1 |
METHOD FOR LIMITING WATER INFLUX IN OIL WELLS | 2012 |
|
RU2506408C1 |
METHOD FOR LIQUIDATION OF ABSORPTION ZONES IN WELL | 2010 |
|
RU2405927C1 |
Authors
Dates
2014-01-20—Published
2012-07-27—Filed