FIELD: construction engineering; major repair of pipes. SUBSTANCE: New pipe is laid in pipe to be replaced which is moved at application of vibrations to end of new pipe. As old pipe escapes from ground, it is cut and removed from pit. EFFECT: possibility of repeated use of pipe withdrawn from ground. 3 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF MOVING LONG PIPE | 2003 |
|
RU2253065C2 |
METHOD OF WITHDRAWAL OF WORN OIL- AND GAS-LINE PIPE FROM GROUND | 2003 |
|
RU2276754C2 |
METHOD OF MOUNTING LONG PIPE | 2003 |
|
RU2244193C1 |
PIPE TRANSPORTATION METHOD | 2001 |
|
RU2197669C2 |
TUBE MOUNTING METHOD | 2001 |
|
RU2195598C2 |
PIPELINE REPAIR METHOD | 2001 |
|
RU2203445C2 |
METHOD OF MOTION OF PIPE | 2000 |
|
RU2191944C2 |
METHOD AND DEVICE FOR MOUNTING OIL-AND-GAS PIPE | 1999 |
|
RU2171414C2 |
ARRANGEMENT METHOD OF PIPE IN WORN-OUT SECTION OF PIPELINE AT ITS UNDERGROUND ROUTING | 2011 |
|
RU2472054C1 |
METHOD OF REPAIR OF INSULATING COATINGS | 2001 |
|
RU2197668C2 |
Authors
Dates
2003-10-27—Published
2001-12-06—Filed