FIELD: hydraulic engineering, particularly pile forming in soft structurally unstable soil. SUBSTANCE: method involves taking soil sample; measuring soil humidity; calculating additional quantity of water necessary for cement-soil pile forming by given mathematic equation; loosening soil within well depth; introducing water-cement solution into soil; stirring the resultant cement-soil mixture up to homogenous state. EFFECT: increased pile strength. 2 cl
Title | Year | Author | Number |
---|---|---|---|
METHOD OF SOIL STABILISATION | 2006 |
|
RU2354778C2 |
METHOD FOR ELEVATING AND LEVELLING BULDINGS | 2006 |
|
RU2333322C1 |
PILE FOUNDATION | 1997 |
|
RU2142534C1 |
METHOD FOR CONSOLIDATION OF GROUND | 1997 |
|
RU2133795C1 |
DEVICE AND METHOD OF SOIL GROUTING | 2006 |
|
RU2330141C2 |
GROUND STABILIZATION METHOD | 1996 |
|
RU2103441C1 |
METHOD OF ROCK ARRANGEMENT OF CEMENT-BOUND PILES | 2009 |
|
RU2407860C1 |
METHOD OF ARRANGEMENT OF DRIVEN PILE IN A WELL WITH AN EXTENDED BASE | 2018 |
|
RU2678172C1 |
METHOD OF INSPECTING QUALITY OF CEMENT-SOIL PILES | 0 |
|
SU1229691A1 |
METHOD OF IDENTIFICATION AND ELIMINATION OF DEFECTS PRODUCED IN GROUND PILES | 2017 |
|
RU2642760C1 |
Authors
Dates
2004-02-20—Published
2002-07-29—Filed