FIELD: construction.
SUBSTANCE: method for arrangement of cement-bound piles includes drilling well by drilling rig with hollow drilling rod, equipped with mixing drill with cutting and mixing blades, with further injection of cement and water. Injection of powder cement and dispersed water is done separately in compressed air jet under pressure of 3-4 atmospheres. Injection of powder cement is started from drilling depth of 0.5 m under pressure of 0.5 atmospheres, which is evenly increased by 1 atmosphere per each metre of drilled well depth, reaching pressure of up to 4 atmospheres with well depth of 4 m with the ratio of 1 wt part of cement to 3-4 wt parts of soil tilled in well. Then after reaching design depth of well, cement injection is terminated, and even injection of dispersed water is started through hollow drilling rod and drill with pressure from 3-4 atmospheres to 0.5 atmospheres, at the ratio of 0.4-0.5 wt parts of water to 3-4 wt parts of compacted soil.
EFFECT: reduced consumption of components introduced in soil, increased forces of pile adhesion to surrounding soil.
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR CONSTRUCTION OF PILE AND COLUMNAR FOUNDATIONS IN PERMAFROST ZONE | 2023 |
|
RU2813086C1 |
METHOD FOR PRODUCING A CLAY SOIL PILE | 2020 |
|
RU2767469C1 |
METHOD FOR CREATING A TRENCH-TYPE CLAY CURTAIN | 2021 |
|
RU2771680C1 |
DEVICE FOR STABILISATION OF SOILS BY BINDING MATERIALS | 2011 |
|
RU2467125C1 |
METHOD TO ERECT COMBINED PILE AND ITS DESIGN | 2011 |
|
RU2486315C2 |
DRILLING METHOD TO ERECT STRIP FOUNDATION IN WATER-BEARING SOILS | 2010 |
|
RU2415228C1 |
METHOD FOR BORED INJECTION PILE ERECTION | 2003 |
|
RU2260093C2 |
METHOD OF STABILISING SOFT GROUND OF ROAD BED AND COMPOSITION TO THIS END | 2010 |
|
RU2474651C2 |
GROUND DAM BUILT ON PERMAFROST BASE | 2006 |
|
RU2307891C1 |
METHOD FOR INJECTION FIXATION AND REINFORCEMENT OF BASES OF FOUNDATIONS OF DEFORMED AND RECONSTRUCTED BUILDINGS AND STRUCTURES, CARRIED OUT BY IMPREGNATING WATER-SATURATED SOILS USING LOW-VISCOSITY HIGH-PENETRATING GELLING HARDENING SOLUTION BASED ON SILICA SOL AND ORGANOSILICON COMPOSITIONS | 2024 |
|
RU2824786C1 |
Authors
Dates
2010-12-27—Published
2009-07-29—Filed