FIELD: oil and gas extracting industry. SUBSTANCE: according to method well operation is stopped. Concrete bridge is mounted above the productive layer. Well is filled with argillous solution. Concrete bridge is placed in jig footplate. In the area of permafrost layer well is filled with non-freezing fluid. Fountain hardware is dismounted. Dead plug is placed in the well on depth of 3-10 meters matching the depth of neutral layer or layer of seasonal heat cycle. Inner hollows of string and pipe heads, well section above dead plug are filled with mortar. Side outlets and upper flange of pipe head are sealed with end caps, for example. EFFECT: reliable well liquidation. 1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF WELL ABANDONMENT WITH COLLAPSED PRODUCTION STRING | 2009 |
|
RU2403376C1 |
PROCESS OF WELL ABANDONMENT | 2002 |
|
RU2222687C1 |
ABANDONMENT METHOD OF OIL-AND-GAS WELL LOCATED IN WATER AREA OF SHALLOW WATER RESERVOIR | 2009 |
|
RU2418152C1 |
METHOD OF ABANDONMENT OF OIL-AND-GAS WELL WITH PRODUCTION STRING MULTIPLE UNTIGHT SECTIONS | 2010 |
|
RU2441135C1 |
PROCEDURE FOR ABANDONMENT OF WELL WITH MULTITUDE OF INTERVALS OF PRODUCTION STRING LEAKAGE IN ZONE OF PERMAFROST ROCK | 2010 |
|
RU2435935C1 |
PROCEDURE FOR ABANDONMENT OF WELL WITH MULTITUDE OF INTERVALS OF LEAKAGE OF PRODUCTION STRING | 2010 |
|
RU2436932C1 |
METHOD OF OIL AND GAS WELL ABANDONMENT WITH MULTIPLE UNSEALED INTERVALS IN OPERATION COLUMN IN ROUGH TERRAIN | 2010 |
|
RU2439288C1 |
ABANDONMENT METHOD FOR WELL WITH GAS SHOW IN TUBING-CASING ANNULUS | 2005 |
|
RU2305754C2 |
METHOD OF PHYSICAL ABANDONMENT OF WELLS | 2014 |
|
RU2576422C1 |
MULTIHOLE LOW DEBIT WELL CONSERVATION IN ABNORMAL LOW PRESSURE RESERVOIR CONDITIONS | 2008 |
|
RU2379467C1 |
Authors
Dates
2004-03-10—Published
2002-05-08—Filed