FIELD: oil-and gas industry.
SUBSTANCE: for method execution at first descent insulation sleeve of a smaller diametre into the well and insulate with it a bottom lateral hole. Then descend insulate a bigger diametre sleeve and insulate with it a top lateral hole, after descend a blind plug, shut a main hole with it and fill pipes and a hole clearance with a non-freezing liquid through a circulation valve. Then install a screw plugs in lateral branches of a Christmas tree fittings and a return valve in a Christmas tree fittings case, seal branches with blind valves.
EFFECT: invention allows shutting the main and lateral multihole wells holes with a fittings at its conservation period, avoid reservoir contamination, decrease conservation and the following de-conservation time consumption.
1 dwg
Title | Year | Author | Number |
---|---|---|---|
MULTI BRANCH, LOW PRODUCTION RATE WELL ASSEMBLY FOR SIMULTANIOUSE SEVERAL RESERVOIRS OF DIFFERENT PRODUCTIVITY PRODUCTION, IN ABNORMALLY LOW RESERVOIR PRESSURE CONDITIONS | 2008 |
|
RU2382182C1 |
METHOD FOR GAS WELL SUSPENSION | 2010 |
|
RU2442877C1 |
PROCEDURE FOR COMPLETION OF GAS WELL (VERSIONS) | 2010 |
|
RU2438007C1 |
MULTI-BOTTOMHOLE DESIGN FOR PRODUCTION IN PERMAFROST AREAS | 2008 |
|
RU2379496C1 |
MARINE MULTIHOLE GAS WELL FOR OPERATION OF OFFSHORE DEPOSITS ARCTIC ZONE WITH SURFACE ARRANGEMENT OF WELLHEAD EQUIPMENT | 2014 |
|
RU2584706C1 |
METHOD OF WELL ABANDONMENT WITH COLLAPSED PRODUCTION STRING | 2009 |
|
RU2403376C1 |
MULTI-BOTTOMHOLE DESIGN FOR PRODUCTION IN PERMAFROST | 2008 |
|
RU2379487C1 |
DESIGN OF COASTAL MULTI-HOLE INTELLIGENT GAS WELL FOR DEVELOPMENT OF OFFSHORE DEPOSIT | 2015 |
|
RU2580862C1 |
METHOD FOR CONSERVATION OF GAS CONDENSATE WELL UNDER CONDITIONS OF ABNORMAL LOW BED PRESSURE | 2007 |
|
RU2339789C1 |
RECOVERY OF SELF-SQUEEZING GAS WELL WITH ABNORMALLY LOW SEAM PRESSURE | 2013 |
|
RU2539060C1 |
Authors
Dates
2010-01-20—Published
2008-07-25—Filed