FIELD: mining industry. SUBSTANCE: method includes equipping well with a T-pipe with quick-opening valves. T-pipe is connected to a tank through a valve. Previously all air is pumped out of the tank for creating limited vacuum volume. One of said valves has access to atmosphere. Well is connected to fluid container through a T-pipe with valves. Previously fluid is pumped into the well. When fluid moves in the well shaft from well-proximate layer area towards day surface, pressure is scoured while well hollow is abruptly opened. A valve is opened, through which well fluid under pressure fills the tank. Fluid hits inner tank wall and is reflected from it while creating pressure impulses in well-proximate layer area in form of damped standing wave, which creates repression-depression impulses. Depression pressure overfall is formed between well-proximate layer area and well hollow. During period of depression half-wave growth waste is removed from the well by means of pumping fluid into container. EFFECT: possible restoration of well operation for wells without tubing string by means of pump and hoisting equipment. 1 dwg
Title | Year | Author | Number |
---|---|---|---|
WELL BORE ZONE TREATMENT METHOD | 2004 |
|
RU2276722C1 |
METHOD FOR WELL-ADJACENT LAYER AREA TREATMENT | 2002 |
|
RU2225505C1 |
METHOD OF WELL TREATMENT IN FORMATION | 2002 |
|
RU2217584C1 |
METHOD FOR PROCESSING WELL-ADJACENT BED ZONE | 2003 |
|
RU2255214C1 |
METHOD FOR TREATMENT OF WELL-ADJACENT BED ZONE | 2003 |
|
RU2243368C1 |
PROCESS OF TREATMENT OF CRITICAL AREA OF FORMATION | 2002 |
|
RU2219334C2 |
METHOD OF CHEMICAL REAGENT IMPULSIVE IMPLOSION BOTTOM HOLE TREATMENT, EQUIPMENT FOR ITS EXECUTION | 2007 |
|
RU2376453C2 |
WELL BORE ZONE TREATMENT METHOD | 2004 |
|
RU2276721C1 |
METHOD FOR TREATMENT OF WELL-ADJACENT BED ZONE | 2003 |
|
RU2241828C2 |
METHOD FOR WELL BORE ZONE TREATMENT | 2004 |
|
RU2281390C1 |
Authors
Dates
2004-03-20—Published
2002-08-15—Filed