FIELD: mining industry.
SUBSTANCE: processing periods include forming of depression pressure change between well-adjacent bed zone and well hollow. Cleaning of well-adjacent bed zone is performed by prior feeding of fluid into well, forming of periodic pressure pulses in well-adjacent bed zone in form of fading standing wave, moving along the well, and decreasing pressure during fluid movement along well from well-adjacent bed zone to day surface for extraction of clogging. Plant for washing wells is used, which is connected to behind-pipe space of well and to tubing pipe. Behind-pipe space of well is isolated by packer along lower limit of perforation range. Perforation range is filled with sedimentation, formed from destroyed rock, and accumulated above packer as a result of gradual and even cleaning of well-adjacent bed zone along whole length of perforation range. Packer is disabled and well is washed clean, without raising tubing pipes column.
EFFECT: higher efficiency.
1 dwg, 1 ex
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR WELL-ADJACENT LAYER AREA TREATMENT | 2002 |
|
RU2225505C1 |
METHOD FOR PULSED WELL BOTTOM ZONE TREATMENT | 2006 |
|
RU2310059C1 |
METHOD OF COMPLEX WAVE ACTION ON WELL AND BOTTOM-HOLE ZONE | 2010 |
|
RU2459943C2 |
WELL BORE ZONE TREATMENT METHOD | 2004 |
|
RU2276721C1 |
METHOD FOR WELL BORE ZONE TREATMENT | 2004 |
|
RU2281390C1 |
PROCESS OF TREATMENT OF CRITICAL AREA OF FORMATION | 2002 |
|
RU2219334C2 |
PROCEDURE OF TREATMENT OF WELL BOTTOMHOLE ZONE | 2007 |
|
RU2355879C1 |
METHOD FOR TREATING WELL-PROXIMATE LAYER AREA | 2002 |
|
RU2225943C1 |
METHOD OF TREATMENT OF BOTTOMHOLE ZONE OF WELL, EQUIPPED WITH PACKER | 2007 |
|
RU2330952C1 |
METHOD OF WELL TREATMENT IN FORMATION | 2002 |
|
RU2217584C1 |
Authors
Dates
2005-06-27—Published
2003-11-27—Filed