FIELD: mining industry. SUBSTANCE: method includes connecting a well-washing apparatus to hole space and tubing string. Treatment periods include forming of depressive pressure overfall between well-adjacent layer area and well hollow by means of prior pumping of fluid into the well and creation of periodic pressure impulses in well-adjacent layer area in form of dumped stationary wave moving in hole space of well. Treatment periods are interchanged with well washing by means of said respective apparatus. EFFECT: combined well hollow and well-adjacent layer area cleaning. 2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR PROCESSING WELL-ADJACENT BED ZONE | 2003 |
|
RU2255214C1 |
METHOD FOR TREATING WELL-PROXIMATE LAYER AREA | 2002 |
|
RU2225943C1 |
METHOD OF WELL TREATMENT IN FORMATION | 2002 |
|
RU2217584C1 |
METHOD OF COMPLEX WAVE ACTION ON WELL AND BOTTOM-HOLE ZONE | 2010 |
|
RU2459943C2 |
METHOD OF WELL FORMATION TREATMENT BY HYDRAULIC PULSE ACTION | 2023 |
|
RU2817366C1 |
METHOD FOR PULSED WELL BOTTOM ZONE TREATMENT | 2006 |
|
RU2310059C1 |
METHOD FOR TREATMENT OF WELL-ADJACENT BED ZONE | 2003 |
|
RU2243368C1 |
METHOD FOR TREATMENT OF WELL-ADJACENT BED ZONE | 2003 |
|
RU2241828C2 |
METHOD OF TREATMENT OF BOTTOMHOLE ZONE OF BED | 2007 |
|
RU2330953C1 |
PROCEDURE OF TREATMENT OF WELL BOTTOMHOLE ZONE | 2007 |
|
RU2355879C1 |
Authors
Dates
2004-03-10—Published
2002-12-23—Filed