FIELD: power engineering; double-circuit nuclear power stations incorporating pressurized water reactor and steam-generating plant. SUBSTANCE: operating process of steam generator divided into several separate circulating loops includes coolant circulation over loop communicating with horizontal tube bank through main circulating pump, feedwater supply to tube space, steam discharge, continuous blowdown including blowdown water discharge and periodic blowdown for slime removal made during shutdown of power unit with loops being disconnected in succession; in the process blowdown water is discharged from steam generator of disconnected loop upon equalizing coolant temperature at steam-generator inlet and outlet in maximal slime accumulation zone located in bottom part of steam generator near coolant outlet. EFFECT: improved design. 2 cl, 1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF OPERATION OF STEAM GENERATOR OF ATOMIC POWER PLANT UNIT | 2003 |
|
RU2250411C1 |
STEAM-GENERATING PLANT OF DOUBLE-CIRCUIT NUCLEAR REACTOR WITH BLOWDOWN AND DRAINAGE SYSTEM | 2017 |
|
RU2742730C1 |
HORIZONTAL STEAM GENERATOR FOR REACTOR PLANT WITH WATER-COOLED POWER REACTOR AND REACTOR PLANT WITH SAID STEAM GENERATOR | 2014 |
|
RU2583324C1 |
METHOD OF MONITORING CONTAMINATION OF STEAM GENERATOR PIPES | 2003 |
|
RU2246070C1 |
STEAM GENERATOR | 2001 |
|
RU2219433C2 |
HORIZONTAL STEAM GENERATOR FOR NUCLEAR POWER PLANT AND METHOD OF ITS ASSEMBLY | 2014 |
|
RU2570992C1 |
METHOD OF DETERMINATION OF RELATIVE STEAM HUMIDITY IN STEAM GENERATOR OF NUCLEAR POWER STATION | 2007 |
|
RU2343346C1 |
NUCLEAR STEAM-GENERATING PLANT WITH PRESSURIZED WATER REACTOR | 2000 |
|
RU2200990C2 |
NUCLEAR STEAM-GENERATION PLANT | 2012 |
|
RU2477898C1 |
STEAM GENERATOR | 2014 |
|
RU2540207C1 |
Authors
Dates
2004-05-10—Published
2002-11-21—Filed