FIELD: liquid mineral extraction technology. SUBSTANCE: according to the method for protecting operation column from solid formations, forming of extracted liquid mineral during its transfer from productive layer to well mouth, before lowering of operation column in the well, by means of hydraulic fracturing, a thief zone is formed. It is formed in the interval of columnar geological section below the pack of regional confining layer, and it is isolated by casing columns of other productive and lost circulation horizons, and it is connected via inter-column space to surface receiving device and to delivery equipment. After that, operation column is lowered, and cementation is performed from well face to formed lost circulation zone. Then, productive layer is uncovered and during process of well completion and mineral extraction protection from solid formations is performed by thermostatting operation column in the interval of possible phase transition. It is performed due to continuous or cycling flow of hot heat carrier along inter-column space into formed lost circulation zone. EFFECT: prevented salt crystallization from oversaturated natural salt waters during their extraction from the well. 2 cl, 1 ex, 1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF WELL PRODUCTION OF LIQUID MINERAL SUSCEPTIBLE TO TEMPERATURE PHASE TRANSITION | 2007 |
|
RU2361067C1 |
OPENING METHOD OF HIGH-PRESSURE STRATUMS, SATURATED BY STRONG BRINES | 2007 |
|
RU2365735C2 |
METHOD FOR SIMULTANEOUS PRODUCTION OF FLUIDS PRONE TO TEMPERATURE PHASE TRANSITION | 2020 |
|
RU2740884C1 |
METHOD FOR WELL CONSTRUCTION IN COMPLICATED CONDITIONS | 2016 |
|
RU2630519C1 |
METHOD FOR EXTRACTION AND USE OF CONCENTRATED GEOTHERMAL BRINES | 2013 |
|
RU2535873C1 |
METHOD FOR REDUCTION OF HEAT EXCHANGE IN THE WELL AT DEVELOPMENT OF MULTILAYER DEPOSIT | 2015 |
|
RU2591325C9 |
METHOD OF TESTING AND CONVERSION OF FLUID-SATURATED FRACTURE RESERVOIR BED (VARIANTS) | 2017 |
|
RU2657052C1 |
METHOD OF CREATING SCREENING CURTAIN WHEN DRILLING HIGH-PRESSURE STRATA SATURATED WITH STRONG CHLORIDE-CALCIUM BRINES | 2020 |
|
RU2735508C1 |
METHOD FOR OPENING HIGH-PRESSURE FORMATIONS SATURATED WITH STRONG BRINES | 2020 |
|
RU2735504C1 |
EXPRESS METHOD FOR FIXING NATURAL AND ARTIFICIAL CRACKS IN BOTTOM-HOLE ZONE OF PRODUCTIVE FORMATION DURING THE INITIAL OPENING BY HORIZONTAL, INCLINED OR VERTICAL DRILLING | 2020 |
|
RU2755600C1 |
Authors
Dates
2004-05-27—Published
2002-01-09—Filed