FIELD: oil and gas industry.
SUBSTANCE: invention refers to oil and gas industry, particularly to well production of liquid minerals. The method consists in pumping hot heat carrier via a closed circulation system formed by means of arrangement of an additional suspended process column between a conductor string and a producer connecting annular and interior spaces of the suspended process column and surface capacity and pump equipment after the principle of communicating vessels through a well head piping. To this purpose in the process of producer boring upon cementing the conductor string there is carried out well sinking for the suspended process column and further for the producing column; first the suspended, then producing columns are lowered; cement behind the producing column is lifted to depth of 50 m below a shoe of the suspended column; formed circulation system is immediately flushed. Further the producing reservoir is exposed; the producing column is protected from solid formations by means of thermostating owing to continuous or periodical pumping of hot heat carrier via the formed circulation system.
EFFECT: increased reliability of column protection and reduced costs.
1 dwg, 1 ex
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR EXTRACTING LIQUID MINERAL INCLINED TO TEMPERATURE PHASE TRANSITION | 2002 |
|
RU2229587C2 |
METHOD FOR SIMULTANEOUS PRODUCTION OF FLUIDS PRONE TO TEMPERATURE PHASE TRANSITION | 2020 |
|
RU2740884C1 |
METHOD FOR EXTRACTION AND USE OF CONCENTRATED GEOTHERMAL BRINES | 2013 |
|
RU2535873C1 |
OPENING METHOD OF HIGH-PRESSURE STRATUMS, SATURATED BY STRONG BRINES | 2007 |
|
RU2365735C2 |
METHOD FOR REDUCTION OF HEAT EXCHANGE IN THE WELL AT DEVELOPMENT OF MULTILAYER DEPOSIT | 2015 |
|
RU2591325C9 |
METHOD OF TESTING AND CONVERSION OF FLUID-SATURATED FRACTURE RESERVOIR BED (VARIANTS) | 2017 |
|
RU2657052C1 |
METHOD FOR WELL CONSTRUCTION IN COMPLICATED CONDITIONS | 2016 |
|
RU2630519C1 |
METHOD OF CREATING SCREENING CURTAIN WHEN DRILLING HIGH-PRESSURE STRATA SATURATED WITH STRONG CHLORIDE-CALCIUM BRINES | 2020 |
|
RU2735508C1 |
EXPRESS METHOD FOR FIXING NATURAL AND ARTIFICIAL CRACKS IN BOTTOM-HOLE ZONE OF PRODUCTIVE FORMATION DURING THE INITIAL OPENING BY HORIZONTAL, INCLINED OR VERTICAL DRILLING | 2020 |
|
RU2755600C1 |
MARINE MULTIHOLE GAS WELL FOR OPERATION OF OFFSHORE DEPOSITS ARCTIC ZONE WITH SURFACE ARRANGEMENT OF WELLHEAD EQUIPMENT | 2014 |
|
RU2584706C1 |
Authors
Dates
2009-07-10—Published
2007-12-17—Filed