FIELD: mining industry. SUBSTANCE: method includes performing preparation excavations, boring ore drifts, boring of wells fans, breaking off of ore, output and loading of received ore and filling of excavated chamber space with rock filling. After performing preparation excavations concurrently with cleaning process a trench is formed of upper ore boring drift of lower chamber by means of reboring well fans from it for a trench height. Removed ore during forming of trench is let out with the rest of the ore excavated by cleaning through the trench of lower chamber. Chambers handling within the deposit is performed in ascending order. EFFECT: increased safety and lowered laboriousness. 1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR BLOCK BOTTOM CREATION IN UPWARD ORE DEPOSIT MINING | 2006 |
|
RU2310075C1 |
METHOD OF UNDERGROUND MINING OF ORE DEPOSITS | 1999 |
|
RU2167296C1 |
METHOD FOR MINING THICK MINERAL DEPOSITS | 1992 |
|
RU2039264C1 |
METHOD OF DEVELOPING THICK ORE DEPOSITS BY UNDERGROUND MINING WITH INTERCHAMBER PILLARS SUPPORT | 2009 |
|
RU2405109C1 |
METHOD OF UNDERGROUND MINING OF STEEP FIELD OF FIRM MINERAL | 2007 |
|
RU2334875C1 |
METHOD FOR DEVELOPMENT OF INCLINED ORE BODIES OF MEDIUM WIDTH | 2016 |
|
RU2632615C1 |
DEVELOPMENT METHOD OF ORE BODIES | 2008 |
|
RU2365754C1 |
MINING METHOD FOR STEEP ORE BODIES | 2007 |
|
RU2325529C1 |
METHOD OF DEVELOPMENT OF STEEP ORE BODY | 2007 |
|
RU2350750C1 |
METHOD OF PREPARATION OF BOTTOM OF STEEPLY-DIPPING ORE DEPOSIT BLOCK | 2001 |
|
RU2206746C1 |
Authors
Dates
2004-05-27—Published
2002-11-04—Filed