FIELD: mining, particularly to develop steep ore deposits in upward order.
SUBSTANCE: method involves sinking hauling entry of overlaying level, field incline, drive connecting hauling entry with chamber, sub level field entry, drive communicated with drill drift and ore drill drift; drilling well ring to upper overlaying chamber undermining mark; cutting ore; discharging and unloading cut ore; filling chamber goaf with pourable rock filler, wherein the rock filler is supplied directly from drives in chamber from hauling entry of overlaying level and rock filler is distributed over chamber area and compacted with the use of earth-moving machinery to create flat bottom.
EFFECT: decreased ore costs and volume of work in block, decreased ore losses due to total ore loading and block bottom cleaning with casing packer with remote control.
4 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR EXCAVATION OF STEEP-FALLING ORE DEPOSITS | 2002 |
|
RU2229600C1 |
METHOD OF MINED-OUT SPACE FILLING | 2015 |
|
RU2603992C1 |
METHOD FOR MINING THICK MINERAL DEPOSITS | 1992 |
|
RU2039264C1 |
DEVELOPMENT METHOD OF THICK STEEPLY DIPPING ORE BODIES | 2012 |
|
RU2502872C1 |
METHOD OF UNDERGROUND MINING OF ORE DEPOSITS | 1999 |
|
RU2167296C1 |
METHOD FOR EXTRACTING THIN AND EXTREMELY THIN STEEP-FALLING AND SLANTED DEPOSITS | 2004 |
|
RU2255222C1 |
METHOD FOR EXTRACTION OF THIN AND EXTREMELY THIN STEEP-FALLING AND SLANTING DEPOSITS | 2004 |
|
RU2255221C1 |
METHOD FOR DEVELOPMENT OF INCLINED ORE BODIES OF MEDIUM WIDTH | 2016 |
|
RU2632615C1 |
METHOD OF DEVELOPING THICK ORE DEPOSITS BY UNDERGROUND MINING WITH INTERCHAMBER PILLARS SUPPORT | 2009 |
|
RU2405109C1 |
DEVELOPMENT METHOD FOR STEEP AND INCLINED DEPOSIT HAVING LOW AND MEDIUM THICKNESS | 2005 |
|
RU2322583C2 |
Authors
Dates
2007-11-10—Published
2006-04-10—Filed